There were 1,856 press releases posted in the last 24 hours and 482,431 in the last 365 days.

U.S. Highway 75 Pipestone bridge replacement project delayed (July 20, 2020)

WILLMAR, Minn. —The U.S. Highway 75 bridge replacement project in Pipestone has been delayed one week because the contractor was unable to begin work today. The bridge crosses over Pipestone County Judicial Ditch #1 just north of Highway 23.

The bridge and adjacent roadway will be closed during construction and through traffic must use the official detour. Traffic will be routed on Highway 23 and Pipestone County Roads 10 and 16. Visitors will be able to get to businesses, parks, campgrounds and homes in Pipestone, which is considered local traffic, not through traffic. The project is estimated to cost $1.5 million and be complete by the end of September. The contractor is Prahm Construction, based out of Slayton, Minn.

Watch for orange cones

MnDOT asks travelers to always drive with caution, and reminds everyone to: 

  • Slow down when approaching every work zone, then navigate through with care
  • Stay alert; work zones constantly change
  • Watch for workers and slow-moving equipment
  • Never enter a roadway that has been blocked with barriers or cones
  • Obey posted speed limits; fine for a work zone violation is $300
  • Minimize distractions behind the wheel
  • Be patient; expect delays, especially during peak travel times 

For updates on the project, please visit mndot.gov/d8/projects/hwy75pipestonebridge.

Follow us on Facebook.

###

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.