There were 1,791 press releases posted in the last 24 hours and 435,801 in the last 365 days.

A statement on WYO 22/Teton Pass from WYDOT Director Darin Westby

”We understand this highway is a lifeline for commuters, deliveries, medical care access and tourism, especially with limited alternatives and the summer season upon us. WYDOT engineers, surveyors and geologists mobilized quickly to try to maintain highway viability as long as possible, but catastrophic failure could not be avoided. WYDOT remains on site decisively engaged on fixing the road and restoring connectivity to the Teton Valley. Safety is our utmost priority, and we ask that recreationists and curious residents avoid the area until it can be stabilized.”

For updates, follow WYDOT Teton County

Photos from Wyoming Highway Patrol drone

 

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.