There were 1,089 press releases posted in the last 24 hours and 453,837 in the last 365 days.

Asphalt Surfacing Project Begins on Interstate 29 from Vermillion Exit North

For Immediate Release:
Thursday, April 27, 2023

Contacts:
Greg Rothschadl, Kevin Heiman, or Sam Caba, 605-668-2929

 

VERMILLION, S.D. – Construction work is scheduled to begin on an asphalt surfacing project on Interstate 29 between exit 26 (Vermillion) north to exit 38. Work on the project will include a box culvert extension, concrete repair, guardrail replacement, cold milling, concrete planing, and asphalt concrete surfacing.

The concrete repair and box culvert extension are scheduled to begin Monday, May 1, 2023. Lane closures, with temporary speed limit reductions, will be used to move traffic through the work zone. Motorists should be prepared for suddenly slowing traffic and for potential delays.

The prime contractor for this $20.1 million construction project is Central Specialties Inc., of Alexandria, MN. The overall project completion date is Thursday, Nov. 9, 2023.

About SDDOT:

The mission of the South Dakota Department of Transportation is to efficiently provide a safe and effective public transportation system.

For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.

Read more about the innovative work of the SDDOT at https://dot.sd.gov.

-30-

 

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.