There were 1,642 press releases posted in the last 24 hours and 459,517 in the last 365 days.

PennDOT Issues Early September Update on Paving in Clinton, Centre Counties

The Pennsylvania Department of Transportation (PennDOT) updated drivers today on the progress of its ongoing paving project in Centre and Clinton counties. All work is extremely weather and schedule dependent. Traffic control will feature roadway flaggers enforcing an alternating traffic pattern.

Drivers can expect the following the week of September 5 in Clinton County:

On Route 1002 (Island Route Road) from Clarks Barn Road to Island Road, crews are scheduled to pave on Thursday and Friday, September 8 and 9.

On Route 664 (Coudersport Pike) from Track Road to Roundhouse Road, crews are scheduled to pave on Wednesday, September 7.

Other roads seeing work in Clinton County include:

Route 120 (Renovo Road) from Sugar Run Road (Route 2022) to Fairview Street (Route 1024)

Route 150 (Church Street) from Monument to the Constitution bridge. This work had been scheduled for early September but has been delayed. 

Route 1024 (Fairview Street) from Bellefonte Avenue to Water Street (Route 120)

Route 2012 (Paul Mack Boulevard) at Brown Street and Logan Avenue intersections

Drivers can expect the following the week of September 5 in Centre County:

Route 144 (Snow Shoe Mountain Road) from Gum Stump Road to Trestle Road, crews are expected to remove guiderail on Tuesday and Wednesday, September 7 and 8. Gabion basket construction will begin Thursday, September 9 and last about three weeks. Paving, shoulder back-up, and guide rail installation will then follow.

Other roads seeing work this year in Centre County are:

Route 26 (College Avenue) signal upgrades at Pike Street and Houserville Road

Route 150 (Benner Pike) signal upgrades at Rolling Ridge Drive and Eagle Point

Route 3001 (Fisherman's Paradise Road)

Route 3004 (Paradise Road) from Route 150 to Fisherman's Paradise Road

Route 3014 (South Atherton) near Branch Road

Route 3020 (Whitehall Road) at the intersections Allen Street and Atherton Street (Route 3014).

This work is part of a $6.9 million project to improve more than 24 miles of roadway in Centre and Clinton counties. PennDOT will issue updates as work progress requires.

Overall work will include milling, placement of binder and wearing courses, final paving, joint repairs, pipe lining and replacement, guide rail updates, signal upgrades, ADA ramp replacement, pavement markings, and miscellaneous construction.

Glenn O. Hawbaker, Inc. of State College, PA, is the contractor on this project. PennDOT expects completion to occur in mid-November.

Motorists are encouraged to "Know Before They Go" by checking conditions on more than 40,000 roadway miles by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.

 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts accessible on the 511PA website.

Subscribe to PennDOT news in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at www.penndot.gov/District2.
 Follow PennDOT on Twitter and like the department on Facebook and Instagram.

MEDIA CONTACT:  Marla Fannin 814-765-0423  Timothy Nebgen 814-765-0598

# # #


Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.