There were 1,884 press releases posted in the last 24 hours and 482,560 in the last 365 days.

Construction scheduled to begin June 27 on Heart River Bridge

BISMARCK, N.D. – Construction is scheduled to begin Monday, June 27, at the Heart River Bridge on North Dakota Highway 22 near Dickinson.

The project consists of a deck overlay, expansion joint replacement, rail retrofit, and spall repair.  

Traffic will be limited to a single lane across the bridge with a traffic signal to guide motorists. A 12-foot width restriction will be in place.

The speed limit will be reduced throughout the project and minimum delays are expected.

The project is expected to be complete later this fall.

The North Dakota Department of Transportation would like to remind motorists to slow down and use caution throughout the work zone.

For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at travel.dot.nd.gov.

- ### -

MEDIA CONTACT: 

David Finley
drfinley@nd.gov
701.328.444

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.