There were 833 press releases posted in the last 24 hours and 438,079 in the last 365 days.

Division Street Bridge over I-80 in Davenport to close September 20 for two weeks

DAVENPORT, Iowa – Sept. 15, 2021 – Bridge repair work on the Division Street Bridge over Interstate 80 in Davenport will require the bridge to be closed for approximately two weeks beginning Monday, Sept. 20, weather permitting, according to the Iowa Department of Transportation’s Davenport construction Office. 

Traffic would be directed to a marked detour for the duration of the project.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help for this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.

#

Contact: Cedric Wilkinson at 563-391-2750 or cedric.wilkinson@iowadot.us.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.