M-139 bridge repairs over St. Joseph River start Monday
COUNTY: Berrien
HIGHWAY: M-139
CLOSEST
START DATE: Monday, May 24, 2021
ESTIMATED END DATE: Friday, Sept. 17, 2021
PROJECT: The Michigan Department of Transportation (MDOT) will be repairing the M-139 bridge over the St. Joseph River in Benton Township. The $541,000 investment includes concrete deck patching, an epoxy overlay, expansion joint replacement, and concrete barrier repairs.
SAFETY BENEFITS: This project will extend the life of the bridge and improve ride quality.
TRAFFIC RESTRICTIONS: One lane will be open in each direction with a traffic shift.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.
