There were 1,104 press releases posted in the last 24 hours and 400,839 in the last 365 days.

Route 2152 Rodi Road Bridge Replacement Completed in Wilkins Township

Pittsburgh, PA – PennDOT District 11 is announcing replacement work has been completed on the Rodi Road (Route 2152) bridge over Chalfont Run in Wilkins Township, Allegheny County.

Bridge replacement work began in early March on Rodi Road between William Penn Highway (Route 2048) and Penn Center Boulevard. Rodi Road. The detour will be removed and the bridge reopened by 5 p.m. today.

The prime contractor on the $948,000 replacement project is Clearwater Construction, Inc.

Motorists can check conditions on more than 40,000 roadway miles, including color-coded winter conditions on 2,900 miles, by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information, and access to more than 950 traffic cameras.

511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional twitter alerts accessible on the 511PA website.

MEDIA CONTACT: Steve Cowan, 412-429-5010

# # #