Traffic switch at Long X Bridge project is rescheduled
A traffic shift on US Highway 85 at the Long X Bridge project, about 16 miles south of Watford City, originally scheduled for June 16 will be rescheduled for a later date.
Construction consists of moving traffic from the temporary bypass south of the Long X Bridge to the completed section of US 85.
During this phase of construction:
- Speed limit reduced to 25 mph
- A width restriction of 13 ft. is in place
The NDDOT would like to remind motorists to slow down and use caution throughout the work zone.
For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at http://www.dot.nd.gov/travel-info-v2/.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.