There were 1,107 press releases posted in the last 24 hours and 400,712 in the last 365 days.

Roadway Activity Report for parts of East and Middle Tennessee (April 6-13, 2022)

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): Construction signs and erosion control measures have been installed. The contractor continues grading activities which will include embankment fill, storm drain installation, and placement of graded solid rock. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Utility relocations for gas, water, sewer, and electric are in progress. Motorists should use caution while traveling through the work zone and be aware of reduced speed zones.

[Jones Bros. Contractors, LLC/Crossville/CNV009]

CUMBERLAND COUNTY I-40 Permitted Work eastbound at MM 320: Buc-ee’s contractor to continue work along Exit 320 Eastbound Off-Ramp along the outside shoulder. Ramp lane width is reduced. Drivers should reduce speed when exiting I-40.

CUMBERLAND COUNTY SR-24 (US-70 N.) Utility Work both directions from LM 14.71 to LM 15.84: Mobile lane closures along SR-24 between Eureka Drive and Maryetta Street. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 03/24/22 through 04/29/22 from 8 am – 3 pm. [2022-148]

CUMBERLAND COUNTY SR-24 (US-70 N.) Utility Work both directions from LM 5.67 to LM 14.71: Mobile lane closures along SR-24 between Little Randolph Road and Eureka Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 03/24/22 through 04/29/22 from 8 am – 3 pm. [2021-731]

CUMBERLAND COUNTY SR-298 (GENESIS RD.) Utility Work both directions from LM 10.26 to LM 13.74: Mobile lane closures along SR-298 between Potato Farm Road and Roy Taylor Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 03/10/22 through 04/27/22 from 8 am – 3 pm. [2021-801]

CUMBERLAND COUNTY SR-462 from SR-28 (US-127N / LM 3.1) to SR-298 (Genesis Road / LM 4.6) in Crossville: Interstate Drive is closed from Stout Drive to Genesis Road. The detour is posted with temporary traffic signals at the intersection of Woodlawn Road and Genesis Road. Grade work and utility relocation activities for water and sewer are in progress. Construction activities are also in progress for the adjoining Buc-ee's project. Activities will require temporary lane closures and/or traffic stoppages on Interstate Drive and Genesis Road as well as short term closures of City streets. Motorists should use caution while traveling through the work zone and be aware of reduced speed zones on Interstate Drive.

[Rogers Group, Inc./Crossville/CNV010]

CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): Contractor will be continuing work on the bridge repair located on SR 28 at LM 30.50 in Cumberland County. Motorists are encouraged to use caution and obey posted speed limit through the work zone. Contractor also will be mobilizing equipment along SR 28 in Cumberland County to begin work clearing along the new alignment. Motorists are encouraged to use caution through the work zone and watch for construction equipment adjacent to roadway.

[Jones Bros. Contractors, LLC/Moore/CNV300]

DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1):  Contractor continues roadside grading operations, installing erosion control measures, and water, gas, and electric line relocation. This will result in intermittent lane closures. Blasting operations may also result in brief road closures. Motorists are advised to use caution and be alert to all construction signage while traveling through the work zone.

[Twin K Construction/James/CNV012]

DEKALB AND WARREN COUNTY SR-56 construction of bridges and paving from south of Warren-Dekalb County line (LM 24.5) to East Bryant St. (LM 2.9): The contractor will shift traffic from SR-56 onto the new alignment section between LM 24.4 in Warren County through LM 1.0 in Dekalb County on 04/12/22. Traffic utilizing Sink Creek Road will be detoured onto the new alignment. Motorist should follow posted signs in the area. The contractor will continue installing concrete box culverts and drainage structures. Grade work, bridge work, paving operations, and utility work on the new roadway alignment are ongoing. The contractor will utilize flagging operations throughout the project for grading operations. Traffic is shifted onto the detour between SR-288 and Old Blue Springs Road for the contractor to complete grade work in the area. Traffic shifts in Smithville will remain from South College Street to the end of project to allow contractor to complete work. Motorists should use caution through the area while flaggers are present to direct traffic. The speed limit has been reduced to 45 mph in the construction zone. Motorists should use caution in this area

[Jones Bros. Contractors, LLC/Harris/CNT011]

FENTRESS COUNTY SR-85 slide repair project: Roadway at 6.4 MM is reduced to one lane and is controlled by traffic lights.

[TDOT/Maint - Crossville/MAINT]

OVERTON COUNTY SR-111 (BYRDSTOWN HWY.) Utility Work both directions from LM 15.65 to LM 17.53: Shoulder and single lane closures from Garrett Mill Road to Big Springs Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 03/31/22 through 04/14/22 from 8 am – 3 pm. [2022-185]

OVERTON COUNTY SR-111 (COOKEVILLE HWY.) Utility Work both directions at LM 4.94: Temporary lane closures and traffic stoppages between Park Road and West Howard Road. Law enforcement will be on-site to assist along with message boards trucks and signage. Motorists should be prepared to stop and use caution traveling through work zone area and be aware of equipment and personnel. 04/11/2022 from 8:30 am - 02:30 pm. [2022-048]

OVERTON COUNTY SR-85 (HILHAM HWY.) Utility Work both directions from LM 4.52 to LM 3.2: Mobile lane closures along SR-85 between Old Standing Stone Road and Jerry Bilbrey Lane. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, cones, and flaggers will be present, 02/17/22 through 04/17/22 from 9 AM and 2 PM. [2021-457]

PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities including installation of barrier rail. Utility relocations for gas are in progress. Motorists shall use caution while traveling through the work zone and be aware of construction personnel.

[Rogers Group, Inc./James/CNV284]

PUTNAM COUNTY SR-135 (BURGESS FALLS RD.) Utility Work both directions from LM 3.25 to LM 5.57: Shoulder and single lane closures from Cane Creek Road to the intersection of Cookeville Boatdock Road and Burgess Falls Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 02/17/22 through 05/17/22 from 9 am – 2 pm. [2021-771]

PUTNAM COUNTY SR-164 (S. Chestnut St) at LM 0.3 and SR-84 (S. Holly St) at LM 9.7 railroad crossing improvements: Contractor will be on site installing erosion control measures throughout project and will be beginning work on installing the new signal footers. Motorists are encouraged to use caution through the work zone and watch for construction equipment and personnel adjacent to the roadway.

[Stansell Electric Company, Inc./Moore/CNV072]

PUTNAM COUNTY SR-24 (US-70N) construction at the intersection of SR-56 (LM 11.6) in Baxter: Contractor will be on site installing erosion control measures. Motorists are encouraged to use caution through the work zone and to watch for construction equipment and personnel adjacent to the roadway.

[Rogers Group, Inc./Moore/CNV098]

PUTNAM COUNTY SR-24 (US-70N) slide repair near LM 30.1: The contractor has installed barrier rail and will continue retaining wall construction. Traffic will be reduced to one lane and controlled by temporary traffic signals at each end of the project. Be prepared to stop when traveling through the work zone.

[Rogers Group, Inc./James/CNU359]

DISTRICT 28

BLEDSOE COUNTY SR-101 Utility Work both directions from LM 0 to LM 9.44: Mobile lane closures along SR-101 between intersection of SR-30 / SR-101 and ending at intersection of SR-101 / Brewer Road. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, and flaggers will be present, 02/03/22 through 04/20/2022 from 9 AM and 2:30 PM. [2021-358]

CANNON AND WARREN COUNTY SR-1 (US-70S) bridge repair and paving from east of Lincoln Lane (LM 11) in Cannon County to Robinson Road (LM 9.4) in Warren County: The contractor is scheduled to resume resurfacing work on 04/11/22. This work will include lane closures throughout the project. Motorist should use caution in the area

[American Pavements, Inc./Harris/CNV075]

COFFEE COUNTY SR-2 (US-41) at SR-55 (McMinnville Highway) intersection improvements in Manchester (LM 14.7): Project activity progression will continue daily with various roadway construction activities being performed. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.

[Rogers Group, Inc./Hussein/CNU006]

COFFEE COUNTY I-24 TDOT Bridge Maintenance eastbound at MM 124.6: Region 2 Bridge Repair will be performing maintenance on the Betsy Willis Road bridge over I-24 at exit 124, Monday, 4/11/22, from 9AM-3PM CST. Eastbound Traffic on I-24 will be affected.

COFFEE COUNTY SR-55 (MCMINNVILLE HWY.) TDOT Bridge Inspection westbound at LM 14.03: Bridge Inspection will be working at the bridge over Little Duck River. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 04/07/22 from 8:30 am – 2:30 pm.

COFFEE COUNTY SR-127 bridge construction over Bradley Creek (LM 4.7): Construction work on this project will continue this week. SR-127 at MM 4.66 will be closed until 09/30/2022 to support bridge construction work over Bradley Creek. A detour route will be provided via Prairie Plains Road and Miller Crossroads Road during construction work, signs and message boards are in place to show the detour route. Motorist should be alert to the new traffic pattern and encouraged to use caution and be alert to construction personnel and equipment

[Dement Construction Company, LLC/Hussein/CNV303]

COFFEE COUNTY SR-2 (US-41) repair of bridge over Blue Spring Creek (LM 21.0): Construction work on this project will continue this week. The roadway will be reduced to one lane and control with traffic signal. One lane will be open to traffic with the restriction of all wide loads, the maximum lane width is 12’. Motorist should be alert to a new traffic pattern and encouraged to use caution and be alert to construction personnel and equipment.

[Mid-State Construction Company, Inc./Hussein/CNV145]

FRANKLIN COUNTY SR-50 (LYNCHBURG HWY.) TDOT Bridge Maintenance both directions at LM 1.57: Bridge Repair will be working at the bridge over Elk River. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 04/11/22 from 8:00 am – 3:00 pm

FRANKLIN COUNTY SR-56 (SHERWOOD RD.) Permitted Work both directions at LM 0.1: Work on the CSX Railroad crossing will require closure of the roadway from 4/08/2022 until 4/11/2022. A detour will be posted. RESTRICTIONS: Roadway closed with detour

FRANKLIN COUNTY SR-15 (US-41) intersection improvement at University Avenue (LM 27.9): Project activity will continue daily. The roadway will be reduced from 4-lanes to 2-lanes. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.

[Dement Construction Company, LLC/Hussein/CNV062]

GRUNDY COUNTY SR-108 (MAIN ST.) TDOT Maintenance both directions from LM 3.3 to LM 3.5: Traffic is reduced to one lane with traffic signals. Work is being done to support the roadway over failed pipes underneath.

GRUNDY COUNTY SR-399 (BAKERTOWN RD.) Utility Work both directions from LM 0 to LM 4.61: Mobile lane closures from the intersection of SR-108 and SR-399 to the Sequatchie / Grundy County Line (near Lovell Road). Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 03/24/22 through 04/22/22 from 9 am – 3 pm. [2021-139 & 2021-596]

GRUNDY COUNTY SR-2 (US-41) TDOT Maintenance both directions from LM 7.2 to LM 7.4: SR 2 Grundy County is reduced to one lane of traffic for survey work on a slide. Traffic signals are in place

[TDOT/Maint - Dunlap/MAINT]

GRUNDY COUNTY SR-56 slide repair between LM 26.3 and LM 26.6: The road will remain one lane controlled by a temporary traffic signal while contractor completes slide repairs in the area. Motorists should use caution in the area.

[Dement Construction Company, LLC/Harris/CNU355]

MARION COUNTY I-24 (US-64) rockfall mitigation westbound between MM 136.2 and MM 140.3: The contractor will be working on I-24 WB at MM 141 – 140, MM 139.0 – 137.0, and MM 136.0 – 135.0. On Tuesday April 12 the contractor will be blasting rock on I-24 WB at MM 137.0. This work will require a slow roll to slow traffic down long enough to blast the rock and clean up the road if necessary. The slow roll and blasting will begin at 11:00 AM CT and only last as long as it takes to clear the road. Tennessee Highway Patrol and a truck mounted attenuator w/ message board will be on site during this work. The other remaining works sites will remain open. Please use caution when traveling through the work zones.

[Wright Brothers Construction Company, Inc./Voiles/CNV912]

SEQUATCHIE COUNTY SR-28 (HWY. 28) Utility Work both directions from LM 1.73 to LM 2.98: Mobile lane closures along SR-28 between Stove Cave Road and Frank Tate Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 03/24/22 through 06/01/22 from 9:30 am – 2:30 pm. [2022-128]

SEQUATCHIE COUNTY SR-8 (HWY. 8) Utility Work both directions from LM 23.32 to LM 24.15: Mobile lane closures along SR-8 between Dennis Road and Dogwood Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 04/07/22 through 05/12/22 from 9:00 am – 2:30 pm. [2022-172]

VAN BUREN COUNTY SR-30 (STATE HWY. 30) TDOT Maintenance both directions from LM 15.4 to LM 15.6: Traffic is reduced to one lane with traffic signals for slide repairs

WARREN COUNTY SR-380 (SPARTA ST.) Permitted Work both directions at LM 2.6: Work on the Caney Fork & Western Railroad bridge will require closure of the roadway from 3/31/2022 until 4/15/2022. A detour will be posted. RESTRICTIONS: Roadway closed with detour.

DISTRICT 29

BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will be performing earthmoving operations and removal of structures. Crews will also be working on foundations for a new bridge over Candies Creek. Brief, intermittent lane closures are possible on SR-60 during daylight hours as this work occurs. Motorists should expect daily lane closures Monday through Friday 9 AM to 3:30 PM at Georgetown Rd (SR-60) and Villa Drive to support the installation of a new gas line. Motorists are advised to reduce speed in the work zone, watch for flaggers assisting with traffic control and for trucks entering/leaving the highway.

[Summers-Taylor, Inc./Wagner/CNV130]

BRADLEY COUNTY SR-2 (N. LEE HWY.) Utility Work northbound at LM 14.10: Shoulder and single lane closures between Hardwick Grove Dr NE and Commons Lane NE. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 04/11/22 through 04/13/22 from 9 am – 3 pm. [2022-204]

BRADLEY COUNTY SR-311 (DALTON PK. S.E.) Utility Work both directions from LM 5.41 to LM 5.3: ROAD CLOSURE and DETOUR on Dalton Pike SE between Baldwin Road and Blackburn Road from 9 am Monday through 4 pm Friday with the road reopening over the weekend. Motorists should reduce speed and follow the detour signage. Businesses and residences will be accessible in the detour area. Signage, cones, and flaggers will be present, 04/11/22 through 05/02/22. [2021-816]

BRADLEY COUNTY I-75 at Exit 33 (SR-308, Lauderdale Highway) bridge work and ramp upgrades:  There are lane shifts in both the Southbound and Northbound lanes from MM 31 to MM 33. The lanes will be reduced to two 11-foot lanes in both directions as work goes on this project.

[Wright Brothers Construction Company, Inc./Curtis/CNV124]

BRADLEY COUNTY SR-312 (HARRISON PK.) TDOT Maintenance both directions from LM 3.1 to LM 3.2: TDOT Maintenance forces have reduced SR-312 to a single lane controlled by a temporary traffic signal due to a storm drainpipe failure. This closure will remain in place until the pipe can be replaced.

[TDOT/Maint - Benton/MAINT]

HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted.

[Wright Brothers Construction Company, Inc./Curtis/CNU011]

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Contractor will be working on ROW fencing and should have no impact on traffic.

[C.W. Matthews Contracting Company, Inc./2001/DB1801]

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Geotechnical investigations will continue. Shoulder closures are possible on I-24 with lane closures on North and South Terrace as well. Additionally, there will be lane closures on I-75 at night between 9PM and 6AM.

[TDOT/Maj Prj - Blevins/DB2101]

HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, there is a possibility on Monday through Wednesday that the shoulder will be closed periodically from MM 6.6 to MM 12.8 Northbound and Southbound.

[Summers-Taylor, Inc./Curtis/CNW046]

HAMILTON COUNTY SR-17 (GLASS ST.) Utility Work northbound at LM 6.25: Shoulder closure between Awtry Street and Campbell Street. Motorists should reduce speed and be aware of personnel. If possible, recommend motorists to find an alternate route. Signage, cones, and flaggers will be present, 03/28/22 through 04/13/22 from 9 am – 3 pm. [2022-071]

HAMILTON COUNTY SR-27 (ROSSVILLE BLVD.) Utility Work both directions at LM 5.66: Shoulder and single lane closures between Foust Street and E. 27th Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 03/31/22 through 04/13/22 from 9 am – 2 pm. [2022-164]

HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions from LM 18.51 to LM 18.71: Shoulder and single lane closures between Thatcher Road and Armstrong Road. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 04/11/22 through 04/22/22 from 9 am – 3 pm. [2022-025]

HAMILTON COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 22.01 to LM 22.2: Shoulder and single lane closures between Fairmount Road and Dowler Lane. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 02/15/22 through 04/20/22 from 9 am – 2 pm. [2021-636]

HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 04/07/22, 04/08/22, 04/11/22, 04/12/22, and 04/13/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. A portion of Tucker Road has been closed from Spalding Drive to 5400 Tucker Road to allow for grading and utility operations.

[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]

HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: Contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place. During repair operations at least one lane of traffic shall remain open in both directions. Motorists are advised to use caution in this vicinity and remain aware of construction activities.

[Mid-State Construction Company, Inc./Osbonlighter/CNV053]

HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing operations at the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection has begun operation & traffic has been shifted to the new alignment. Ferdinand Piech Way will still be closed to through traffic. Traveling public should be cautious of the new traffic pattern in effect including a lowered speed limit. The traveling public should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.

[Talley Construction Company, Inc./Osbonlighter/CNU221]

MCMINN COUNTY SR-310 bridge repair over Conasauga Creek (LM 4.4): During this reporting period, the contractor will be working on placing new asphalt overlays on the bridge. SR-310 is reduced to a single lane controlled by a temporary traffic signal to support this work. Motorists are asked to reduce speed in the work zone and obey all traffic signals and related signage. RESTRICTIONS: 10-foot horizontal clearance

[Southern Constructors, Inc./Wagner/CNV301]

MEIGS COUNTY SR-304 repair of bridge over Big Sewee Creek (LM 4.8): Contractor will be performing bridge repair operations on the SR-304 bridge over Big Sewee Creek. During this project, SR-304 will have lane closures with 10ft width restrictions. A detour will be in place redirecting SR-304 truck traffic onto Watts Bar Hwy & SR-58. During repair operations, only one lane of traffic shall remain open for local traffic. A temporary traffic signal shall be in place to direct traffic thru the construction zone.

[Mid-State Construction Company, Inc./Osbonlighter/CNV305]

POLK COUNTY SR-315 (TELLICO-RELIANCE RD.) TDOT Bridge Inspection both directions from LM 0.0 to LM 0.2: On Tuesday, 04/12/22 and/or Wednesday, 04/13/22, a flagging operation will take place on the bridge over the Hiwassee River. The operation will occur between 8 AM and 5 PM.

POLK COUNTY SR-33 (HWY. 411) TDOT Bridge Inspection both directions from LM 1.9 to LM 2.2: On Tuesday, 04/12/22 and/or Wednesday, 04/13/22, one lane will be closed each direction on the bridges over the Hiwassee River. The closures will be in place between 8 AM and 5 PM.

POLK COUNTY SR-40 (US-HWY. 64) TDOT Bridge Inspection both directions from LM 24.8 to LM 25.0: On Tuesday, 04/12/22 and/or Wednesday, 04/13/22, a flagging operation will take place on the bridge over the railroad and branch. The operation will occur between 8 AM and 5 PM.

POLK COUNTY SR-40 (US-64) bridge over the Ocoee River: During this reporting period, the contractor will be working on the construction of the new bridge deck and the relocation of water lines. Brief intermittent lane closures are possible on US-64 (SR-40) Monday through Friday 8 AM to 5:30 PM as the contractor works to relocate utility lines on the project. Motorists are asked to reduce speed in the work zone and watch for trucks entering/leaving the highway.

[Charles Blalock and Sons, Inc./Wagner/DB1802]

RHEA COUNTY SR-378 resurfacing from SR-29 (US-27 / LM 0.0) to west of SR-29 (US-27 / LM 1.61) and SR-30 from east of Railroad Street (LM 8.7) to near SR-29 (US-27 / LM 9.2): During this reporting period, there will be intermittent lane closures on both SR-378 and SR-30 during the day as the contractor works on this project. Expect possible long delays as flaggers will be directing traffic on this project.

[Rogers Group, Inc./Curtis/CNV100]

RHEA COUNTY The grading, drainage, construction of bridges, paving and signals on a S.I.A. route serving Nokian Tyres: : Construction activity at the Nokian Tyres SIA project continues just North of Dayton, TN. The traveling public should be alert to construction vehicles entering and exiting the site. SR-29 traffic has been moved back in its normal traffic pattern.

[Dement Construction Company, LLC/Curtis/CNU014]

REGION WIDE

REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. Flaggers will assist with traffic control as needed.

[NABCO Electric Company, Inc./Osbonlighter/CNT354]

REGION 2 TDOT Maintenance drainage work: There will be possible short-term lane and shoulder closures at various locations in Region 2 in order to clean rock and debris from ditches on an as-needed basis. One lane will be maintained at all times.

[TDOT Operations/Maintenance/R2MAINT]

REGION 2 TDOT Maintenance pothole repair and pavement patching: There will be possible short-term emergency lane closures at various locations in Region 2 in order to repair potholes and patch pavement on an as-needed basis. Depending on location and severity these repairs may be done during the day or at night. In addition to performing the work, regional Operations crews will also provide traffic control.

[TDOT Operations/Maintenance/R2MAINT]

REGION 2 TDOT mowing operations: There will be possible short-term lane closures at various locations on interstates and state routes in Region 2 in order to perform mowing activities on an as-needed basis. In addition to performing the work, regional Operations crews will also provide traffic control.

[TDOT/Maintenance/R2MAINT]

REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor may have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed

[Cumberland Guardrail, Inc./Harris/CNV112]

REGION 2 The on-call concrete pavement repair on various interstates and state routes: During the daytime the contractor will be repairing concrete pavement on the SR-111 on and off-ramps to SR-1 in White County. Half the width of the ramps will be closed during construction. Please slow down and use caution when driving through the work zone.

[Vulcan Construction Materials, LLC/Voiles/CNU373]

REGION 2 The random on-call cable barrier repair on various Interstate and State Routes: The contractor may have short term shoulder closures in order to perform cable rail repair. Both travel lanes will always remain open to traffic on the interstate during any work that is performed

[LU, Inc./Harris/CNV272]

REGION 2 The sweeping and drain cleaning on various Interstate and State Routes: There will be an area wide sweeping operation on selected regional state routes and interstates. This activity will be supported by a mobile lane closure. Hours of activity are Sunday through Thursday night between 8 PM and 6 AM during this reporting period.

[Blevins Enterprises, Inc./Curtis/CNV302]

RESTRICTIONS

FRANKLIN COUNTY - : Roadway closed with detour

WARREN COUNTY - : Roadway closed with detour.

MCMINN COUNTY - CNV301: 10-foot horizontal clearance

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.

Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. All times are local.