There were 1,632 press releases posted in the last 24 hours and 401,736 in the last 365 days.

TurkStream gas pipeline’s offshore section completed

Background

TurkStream is the project for a gas pipeline stretching across the Black Sea from Russia to Turkey and further to Turkey's border with neighboring countries. The first string of TurkStream is intended for Turkish consumers, while the second string will deliver gas to southern and southeastern Europe. Each string will have the throughput capacity of 15.75 billion cubic meters of gas per year. South Stream Transport B.V. is responsible for the construction of the gas pipeline's offshore section.

The construction contractor for both strings of the TurkStream gas pipeline’s offshore section is Allseas Group. The Group is a global leader in offshore pipelaying and subsea construction. Allseas is focused on comprehensive project implementation, including design, material and equipment procurement, construction, and commissioning.

Pioneering Spirit is the world’s largest construction vessel (477 meters in length and 124 meters in width). The vessel is designed to lay pipelines in deep-water areas, as well as to install and dismantle large oil and gas offshore platforms. The ship is owned by Allseas.

In Russia, a landfall has been built near the town of Anapa and the ongoing start-up operations will be finished in 2018. In Turkey, a receiving terminal is being constructed near the settlement of Kiyikoy.