Launch of second stage of Urengoyskoe field
Launch of second stage of Urengoyskoe field
16 December 2014SeverEnergia (a joint venture between NOVATEK and Gazprom Neft) launches the second stage of the Urengoyskoye field (within the Samburgskiy license area) including the second train of the gas condensate de-ethanization unit. Overall capacity of the two stages of field development is approximately 13 billion cubic meters (bcm) of natural gas and more than 4.7 million tons of de-ethanized gas condensate per annum.
The wells drilled at the Urengoyskoye field target the Achimov deposits, which are characterized by relatively high depth (approximately 3,700 meters) and high share of gas condensate in the hydrocarbon flow.
REFERENCE
SeverEnergia via its fully consolidated subsidiary Arcticgas holds the development and production licenses for the Samburgskiy, Yevo-Yakhinskiy, Yaro-Yakhinskiy and North-Chaselskiy license areas.
As at 31 December 2013, the proved reserves of the Urengoyskoye field within the Samburgskiy license area were estimated at 214 bcm of natural gas and 52 million tons of gas condensate according to the SEC standards.
- Exploration and production photo gallery:
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.


