There were 178 press releases posted in the last 24 hours and 478,871 in the last 365 days.

Hampton Roads District Weekly Traffic Alert: June 14-20, 2026

All work is scheduled weather permitting. Updated information on work zones and lane closures is available on 511.vdot.virginia.gov.

Road Work Ahead Sign

NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.

Scheduled closures are subject to change based on weather conditions and other factors.

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511 Virginia (511.vdot.virginia.gov), download the VDOT 511 smartphone app, or dial 511.

Bridges and tunnels

Hampton Roads Bridge-Tunnel, I-64:

  • Single-lane closures westbound June 15-17 from 9 p.m. to 5 a.m. 

Monitor-Merrimac Memorial Bridge-Tunnel, I-664:

  • Alternating, mobile, single-lane closures southbound June 16 from 9 a.m. to 2 p.m. 
  • Alternating, single-lane closures from 9 p.m. to 5 a.m.:  
    • Both directions June 15  
    • Southbound June 16, 18   
    • Northbound June 17  

James River Bridge, Route 17:

  • Alternating, mobile, single-lane closures from 9 p.m. to 4 a.m.: 
    • Northbound June 16 
    • Southbound June 17  

High Rise Bridge, I-64:

  • Single-lane, mobile closures eastbound June 16-17 from 9 p.m. to 4 a.m. 

Elizabeth River Crossings (Downtown/Midtown Tunnels):

  • Go to DriveERC.com for scheduled closures on the Downtown Tunnel (I-264), Midtown Tunnel (Route 58) and MLK Expressway (Route 164).

HRBT Expansion Project:

  • View lane closures and project updates related to the HRBT Expansion Project (hrbtexpansion.vdot.virginia.gov/traffic-alerts/)

Interstates

I-64, Newport News:

  • Full ramp closures at I-64 and J. Clyde Morris Boulevard (Route 17) as early as 8 p.m. to 5 a.m.:  
    • Off-ramp from I-64 west to southbound J. Clyde Morris Boulevard (exit 258A) June 16-18 
    • Off-ramp from I-64 west to northbound J. Clyde Morris Boulevard (exit 258B) June 15-17 
    • On-ramp from northbound J. Clyde Morris Boulevard to I-64 west June 14-15 
    • On-ramp from southbound J. Clyde Morris Boulevard to I-64 west June 17-18 

I-64, James City County:

  • Full on- and off-ramp closures from I-64 west to Croaker Road (exit 231B) June 15-18 from 7 p.m. to 5 a.m.  

I-64, Chesapeake:

  • Full ramp closures from I-64 west to I-464 north (exit 291A) June 14-17 from 8 p.m. to 5 a.m. 
  • Full ramp closures from I-64 east to I-464 north (exit 291A): 
    • June 14 from 10 p.m. to 5 a.m. 
    • June 15-17 from 11 p.m. to 5 a.m. 

I-64, Gap Widening Segment C, James City County: 

I-64, Hampton Roads Express Lanes (HREL):

  • The Hampton Roads Express Lanes project website contains additional information on the express lanes project-related closures and traffic impacts. (vdot.virginia.gov/projects/major-projects/64expresslanes/news--traffic-alerts/)

  • An interactive map displaying long-term traffic impacts across the various Hampton Roads Express Lanes construction projects can be found at the project website. (vdot.virginia.gov/projects/major-projects/64expresslanes/long-term-traffic-impacts/)

I-64, Norfolk Reversible Express Lanes:

  • Full closure in both directions:
    • Continuously from 8 p.m. June 12 until 3 a.m. June 15   
    • June 15-18 from 9:30 a.m. to 12:30 p.m.    
    • June 15-18 from as early as 8 p.m. to 3 a.m. 

I-64, Chesapeake Express Lanes: 

  • Full Express Lane closures westbound between Great Bridge Boulevard (exit 292) and Greenbrier Parkway (exit 289) June 14-17 from as early as 8 p.m. to as late as 10 a.m. 
  • Full Express Lanes closures eastbound between Indian River Road (exit 286) and I-264 (exit 284) June 16-17 from 8 p.m. to 5 a.m. 

I-64, HREL Hampton 4C Project:

  • Full off-ramp closures on I-64 June 14-17 from as early as 10 p.m. to 5 a.m. (Non-conflicting ramp closures may be in place concurrently): 
    • I-64 west to Armistead Avenue/LaSalle Avenue (exit 265B) 
    • I-64 east to Rip Rap Road, Armistead Avenue/Langley AFB (exit 265C) 
  • Full ramp closures on I-64 June 15-17 from as early as 9 p.m. to 5 a.m. (Non-conflicting ramp closures may be in place concurrently): 
    • On-ramp from Settlers Landing Road/Woodland Road to I-64 west 
    • Off-ramp from I-64 east to Settlers Landing Road/Woodland Road (exit 267) 
    • On-ramp from Settlers Landing Road/Woodland Road to I-64 east 
  • Alternating, single-lane closures on I-64 in both directions from Mallory Street (exit 268) to LaSalle Avenue (exit 265) June 14-17 from 10 p.m. to 5 a.m. 
  • Brief, intermittent stoppages on I-64 in both directions between Mallory Street (exit 268) and LaSalle Avenue (exit 265) June 15-18 between 12:01 a.m. and 4 a.m. 
  • Traffic shifts on I-64 from the inside lanes to the outside lanes in both directions between the Hampton River bridge and Mallory Street (exit 268), with full details in traffic alert. 
  • Long-term, single-lane closure on off–ramp from I-64 east to Settlers Landing Road/Woodland Road (exit 267).
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A).
  • Long-term traffic shift of I-64 in both directions at the Hampton River bridges with all traffic moved to the reopened westbound bridge with details in full traffic alert.
  • Long-term traffic shift with a new stop sign on I-64 west off-ramp at Armistead Avenue/LaSalle Avenue (exit 265B) and lane reduction on North Armistead Avenue at Thomas Street.
  • Long-term traffic shifts toward the median on I-64 in both directions between North Armistead Avenue (exit 265) and the Hampton River bridge, as well as between the Hampton River bridge and Settlers Landing Road/Woodland Road (exit 267).
  • Long-term traffic shifts toward the outside lanes on I-64 in both directions between Mallory Street (exit 268) and Settlers Landing Road/Woodland Road (exit 267).

I-64, HREL Norfolk 1A Project:

  • Alternating single-lane closures on I-64 in both directions from Granby Street (exit 276) to Chesapeake Boulevard (exit 278) continuously from as early as 7 p.m. June 12 to 5 a.m. June 15. (No eastbound work on June 14 between 11 a.m. and 3 p.m.) 
  • Single-lane closures on I-64 east on the Willoughby Bay Bridge from 15th View Street (exit 272) to 4th View Street (exit 273) June 14-17 from as early as 9 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 west to Granby Street (exit 276A) June 14-17 from as early as 8 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 east to Granby Street/I-564 west (exit 276A) June 14-17 from as early as 9 p.m. to 4 a.m. 
  • Full off-ramp closures from I-64 west to Little Creek Road (exit 276C) June 14-17 from as early as 10 p.m. to 5 a.m. 
  • Full on-ramp closures from Little Creek Road to I-64 east June 14-17 from as early as 10 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 west to Tidewater Drive (exits 277A and 277B) June 14-17 from as early as 10 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 east to Tidewater Drive (exits 277A and 277B) June 14-17 from as early as 10 p.m. to 5 a.m. 
  • Full on-ramp closures from Tidewater Drive to I-64 east June 14-17 from as early as 10 p.m. to 5 a.m. 
  • Full on-ramp closures from Tidewater Drive to I-64 west June 14-17 from as early as 8 p.m. to 5 a.m. 
  • Alternating single-lane closures on I-564 from I-64 to Terminal Boulevard: 
    • Eastbound June 14-17 from as early as 7 p.m. to 3 p.m. 
    • Westbound June 14-17 from as early as 9 a.m. to 4 a.m. 
  • Alternating single-lane closures on I-64 in both directions from Granby Street (exit 276) to Chesapeake Boulevard (exit 278) June 15-18 from as early as 7 p.m. to 5 a.m. 
  • Long-term traffic split on I-64 east at Tidewater Drive (exits 277A and 277B).  Visit webpage for more information on this temporary traffic pattern.
  • Long-term traffic shift on I-64 east from west of I-564/Granby Street (exit 276) to Tidewater Drive (exit 277) toward the inside lanes, with details in the full traffic alert. 
  • Long-term traffic shift toward the outside of the roadway on I-64 west between Tidewater Drive (exit 277) and Patrol Road. 
  • Long-term traffic shift toward the outside of the roadway on I-64 east between Patrol Road and Tidewater Drive (exit 277). 
  • Long-term traffic shift on I-564 east off-ramp to Little Creek Road (exit 4) and lane reduction on westbound East Admiral Taussig Boulevard.  
  • Long-term full on-ramp closure from northbound Tidewater Drive to I-64 west with detour to next left-turn lane onto on-ramp to I-64 west.  
  • Long-term full on-ramp closure from southbound Tidewater Drive to I-64 east, with new left turn at Thole Street to access I-64 east. 
  • Long-term traffic pattern on I-64 west between Tidewater Drive (exit 277) and Patrol Road in Norfolk with one mainline lane closed and new left exit and temporary lane open alongside the Norfolk Reversible Roadway. Visit webpage for more information on this temporary traffic pattern.

I-64, HREL Newport News/Hampton 4A/4B Project:

I-464, Chesapeake:

  • Full northbound closures on I-464 north at I-64 interchange June 17-18 from 1 a.m. to 4 a.m. 
  • Full ramp closures from I-464 south to I-64 west (exit 1A) June 15-17 from 8 p.m. to 5 a.m. 
  • Full on-ramp closures from Route 17 (Dominion Boulevard) north to I-464 north:  
    • Continuously from 5 a.m. June 14 to 5 a.m. June 15 
    • June 15-18 from 9:30 a.m. to as late as 3 p.m. 
    • June 15-17 from 8 p.m. to 5 a.m. 

 I-264, Portsmouth:

I-264, Virginia Beach:

  • Full on-ramp closures from Independence Boulevard to I-264 west June 14-18 from 9 p.m. to 5 a.m. 

I-664, Chesapeake: 

  • Full off-ramp closures June 14-18 from 9 p.m. to 5 a.m.: 
    • I-664 south to Portsmouth Boulevard (exit 11A)  
    • I-664 north to Dock Landing Road (exit 12) 

I-564/Intermodal Connector, Norfolk:

  • Full on and off-ramp closures from Naval Station Norfolk Gate 3A (Bainbridge Avenue) to I-564 east continuously from 7:30 p.m. June 12 until 4 a.m. June 15  
  • Full off-ramp closures of the Intermodal Connector west ramp to Seabee Road June 15-19 from 9:30 a.m. to 4:30 p.m.


Last updated: June 12, 2026

© Copyright , VDOT. All rights reserved

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.