There were 2,287 press releases posted in the last 24 hours and 491,337 in the last 365 days.

Safety Labeling Change Orders

4/28/2023 NDA-019758 Clozaril (Clozapine) HERITAGE LIFE SCIENCES BARBADOS INC Archive 9/20/2021 NDA-018936 Prozac (Fluoxetine Hydrochloride) ELI LILLY AND COMPANY  Archive 4/11/2019 NDA-022526 Addyi (Flibanserin) SPROUT PHARMACEUTICALS INC Archive 3/09/2018 NDA-020839 Plavix (Clopidogrel Bisulfate) SANOFI AVENTIS US LLC Archive 2/23/2017 ANDA-071212, ANDA-071173, ANDA-071172, ANDA-071157, ANDA-071156 Haloperidol FRONTIDA BIOPHANN INC Archive 2/23/2017 ANDA-089903, ANDA-089523 Prochlorperazine Edisylate  WEST-WARD PHARMACEUTICALS CORP Archive 12/20/2016 ANDA-075523 Naloxone and Pentazocine  SUN PHARMACEUTICAL INDUSTRIES, INC Archive 12/16/2016 ANDA-081002 Meperidine Hydrochloride WEST-WARD PHARMACEUTICAL CORP Archive 12/16/2016 ANDA-070765, ANDA-070766,
ANDA-070683 Amitriptyline Hydrochloride and Chlordiazepoxide,
Oxazepam FRONTIDA BIOPHARM INC Archive 12/16/2016 ANDA-070444, ANDA-070445  Flurazepam Hydrochloride  PAR PHARMACEUTICAL INC Archive 12/16/2016 ANDA-075045, ANDA-075046 Butorphanol Tartrate  WEST-WARD PHARMACEUTICALS CORP Archive 12/16/2016 ANDA-205001 Acetaminophen and Hydrocodone Bitartrate  PAR PHARMACEUTICAL, INC Archive 12/16/2016 ANDA-089671, ANDA-089672  Acetaminophen and Codeine Phosphate FRONTIDA BIOPHARM INC Archive 11/08/2016 ANDA-040805 Hydroxyzine Hydrochloride  HETERO USA, INC
U.S. AGENT FOR HETERO LABS LIMITED UNIT- III Archive 10/21/2016 ANDA-090387 Testosterone Cypionate  WEST-WARD PHARMACEUTICAL CORP Archive 10/21/2016 ANDA-091244 Testosterone Cypionate  WEST-WARD PHARMACEUTICAL CORP Archive 9/07/2016 NDA-022276 Nicardipine Hydrochloride EXELA PHARMA SCIENCES, LLC Archive 5/09/2016 ANDA-070088 Ibuprofen  BASF CORPORATION Archive 5/09/2016 ANDA-074819,
ANDA-079093 Etodolac,
Nabumetone PROSAM LABS, LLC Archive 12/15/2014 NDA-050824 Omeclamox-Pak (Omeprazole, Amoxicillin, and Clarithromycin) GASTROENTERO-LOGIC, LLC Archive 9/18/2014 ANDA-078969 Granisetron Hydrochloride  INC RESEARCH LLC Archive 9/09/2014 ANDA-086498, ANDA-086499, ANDA-086500, ANDA-086501, ANDA-086502, ANDA-086503, ANDA-083827 Amitriptyline Hydrochloride,
Imipramine Hydrochloride  ALRA LABORATORIES, INC Archive 7/31/2014 NDA-009470 Xylocaine Viscous (Lidocaine Hydrochloride) FRESENIUS KABI USA LLC Archive 7/22/2014 ANDA-076015 Fluoxetine Hydrochloride PHARMACEUTICAL ASSOCIATES, INC Archive 7/22/2014 ANDA-040751, ANDA-040752, ANDA-040753 Imipramine Hydrochloride  PROSAM LABS, LLC Archive 7/22/2014 ANDA-075525 Fluoxetine Hydrochloride HI-TECH PHARMACAL CO., INC Archive 7/22/2014 ANDA-071196,
ANDA-071258  Trazodone,
Trazodone Hydrochloride  APOTEX INC Archive 7/03/2014 NDA-014694 Hexadrol (Dexamethasone Sodium Phospate) ORGANON USA INC Archive 6/03/2014 ANDA-088184, ANDA-088185  Hydroxyzine Hydrochloride  FRESENIUS KABI USA, LLC Archive 6/03/2014 ANDA-040600, ANDA-040602, ANDA-040604 Hydroxyzine Hydrochloride  MIKAH PHARMA LLC Archive 6/03/2014 ANDA-087014 Orgatrax (Hydroxyzine Hydrochloride) ORGANON USA INC Archive 10/24/2013 ANDA-040261 Acetaminophen, Butalbital, and Caffeine WEST-WARD PHARMACEUTICALS CORP Archive 10/24/2013 ANDA-087811 Phrenilin (Acetaminophen and Butalbital) KELLER AND HECKMAN LLP
U.S. AGENT FOR VALEANT INTERNATIONAL BERMUDA Archive 10/24/2013 ANDA-040864 Acetaminophen, Butalbital, and Caffeine MIRROR PHARMACEUTICALS LLC Archive 10/24/2013 ANDA-088831 Phrenilin Forte (Acetaminophen and Butalbital) KELLER AND HECKMAN LLP
U.S. AGENT FOR VALEANT INTERNATIONAL BERMUDA Archive 10/24/2013 ANDA-040336 Acetaminophen, Butalbital, and Caffeine  WEST-WARD PHARMACEUTICALS CORP Archive 10/24/2013 ANDA-040688 Acetaminophen, Caffeine, and Dihydrocodeine Bitartrate WRASER PHARMACEUTICALS Archive 10/24/2013 ANDA-040883 Acetaminophen, Butalbital, and Caffeine  MIRROR PHARMACEUTICALS LLC Archive 8/19/2013 ANDA-077417, ANDA-077809 Ciprofloxacin  WATSON LABORATORIES, INC. - FLORIDA Archive 8/19/2013 ANDA-078712 Ciprofloxacin  SANDOZ, INC Archive 5/10/2013 ANDA-088704 Triacin-C® Cough Syrup (Codeine Phosphate, Pseudoephedrine Hydrochloride, and Triprolidine Hydrochloride) CLINSMART LLC
U.S. AGENT FOR STI PHARMA LLC Archive 5/10/2013 ANDA-087006 Acetaminophen and Codeine Phosphate WOCKHARDT EU OPERATIONS (SWISS) AG Archive 5/10/2013 ANDA-040223 Acetaminophen and Codeine Phosphate BARR LABORATORIES, INC Archive 5/10/2013 ANDA-040441 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC - FLORIDA Archive 5/10/2013 ANDA-040447, ANDA-040488 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC - FLORIDA Archive 5/10/2013 ANDA-089997, ANDA-089998, ANDA-089999 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC Archive 5/10/2013 ANDA-040688 Acetaminophen, Caffeine, and Dihydrocodeine Bitartrate WRASER PHARMACEUTICALS Archive 5/10/2013 ANDA-040701 Acetaminophen, Caffeine, and Dihydrocodeine Bitartrate BOCA PHARMACAL, INC. Archive 5/10/2013 ANDA-089671, ANDA-089672 Acetaminophen and Codeine Phosphate FRONTIDA BIOPHARM INC Archive 5/10/2013 ANDA-040443 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC - FLORIDA Archive 4/11/2013 ANDA-073143, ANDA-074436 Cyclobenzaprine Hydrochloride  WATSON LABORATORIES, INC Archive 4/11/2013 ANDA-072854 Cyclobenzaprine Hydrochloride  SANDOZ, INC Archive 4/11/2013 ANDA-077209, ANDA-077291 Cyclobenzaprine Hydrochloride  PROSAM LABS, LLC Archive 12/20/2010 NDA-021358 MultiHance (Gadobenate Dimeglumine) and MultiHance Multipack (Gadobenate Dimeglumine) BRACCO DIAGNOSTICS, INC Archive 11/02/2010 ANDA-074900, ANDA-074901 Atracurium Besylate  BEDFORD LABORATORIES Archive 11/02/2010 ANDA-074944,
ANDA-074945 Atracurium Besylate  WATSON PHARMACEUTICALS, INC Archive 11/02/2010 ANDA-090243 Vecuronium Bromide  AKORN-STRIDES, LLC Archive 11/02/2010 ANDA-078562 Mivacurium Chloride PISGAH LABS, INC Archive 11/02/2010 ANDA-074334 Vecuronium WATSON PHARMACEUTICALS, INC Archive 11/02/2010 ANDA-075218 Vecuronium Bromide  BAXTER HEALTHCARE CORPORATION Archive 6/02/2010 NDA-020692,
NDA-021077,
NDA-021254 Serevent Diskus (Salmeterol Xinafoate),
Advair Diskus (Fluticasone Propionate and Salmeterol), Advair HFA (Fluticasone Propionate and Salmeterol Xinafoate) GLAXOSMITHKLINE  Archive 6/02/2010 NDA-021929 Symbicort pMDI (Budesonide and Formoterol Fumarate) ASTRAZENECA LP  Archive 3/09/2010 NDA-019309 Vasotec (Enalapril Maleate) BIOVAIL LABORATORIES INTERNATIONAL SRL Archive 1/21/2010 NDA-006188 Propylthiouracil  DAVA PHARMACEUTICALS, INC Archive 7/19/2009 NDA-020592, NDA-021253; NDA-021086  Zyprexa (Olanzapine), Zyprexa Zydis (Olanzapine) ELI LILLY AND COMPANY Archive 7/19/2009 NDA-021520 Symbyax (Fluoxetine and Olanzapine) ELI LILLY AND COMPANY Archive 7/30/2008 BLA-103234 Procrit (Epoetin Alfa) AMGEN, INCORPORATED Archive 7/30/2008 BLA-103951 Aranesp (Darbepoetin Alpha) AMGEN, INCORPORATED Archive

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.