There were 1,139 press releases posted in the last 24 hours and 406,324 in the last 365 days.

California College Completes 4.5-MW Solar Project

Butte College (CA) has completed installation of a 4.5-megawatt (MW) photovoltaic system. The system is comprised of 25,000 panels installed throughout the campus on parking structures, buildings, and over covered walkways. The solar panels were installed in three phases beginning in 2005, and can now generate up to 6.5 million kilowatt hours (kWh) of electricity each year. The solar system is expected to meet all of the electricity demand of the college's 21,000 students.

News Release � Butte College will be powered by the sun

Additional Information � Butte College Sustainability

Contact: Lisa DeLaby, 530-521-5201

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.