There were 126 press releases posted in the last 24 hours and 455,329 in the last 365 days.

Construction began Monday on ND 200 near Beulah

BISMARCK, N.D. - Construction began Monday, July 12, on North Dakota Highway 200 from the south junction of ND 8 near Halliday to the junction of ND 49 near Beulah.  

The project will include milling and asphalt overlay, as well as minor sidewalk reconstruction in Dodge. A roundabout will be constructed at the intersection of ND 200 and ND 49.

Flaggers will be present during certain phases of the project. The speed limit will be reduced throughout the work zone. A width restriction of 11 feet will be in place throughout the milling and overlay operations.

Traffic will be maintained through the intersection of ND 200 and ND 49 during the construction of the roundabout using flaggers and a four-way stop condition.

The project is expected to be completed this fall.

The North Dakota Department of Transportation would like to remind motorists to slow down and use caution throughout the work zone.

For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at travel.dot.nd.gov.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.