There were 2,040 press releases posted in the last 24 hours and 445,299 in the last 365 days.

Construction to begin on U.S. 52B in Harvey

Construction to begin on U.S. 52B in Harvey

BISMARCK, N.D. – Construction is scheduled to begin on U.S. Highway 52B, in Harvey, Monday, May 24.

 

Construction includes milling and asphalt overlay along with pavement marking and a valley gutter replacement.

 

During the milling and paving operations, traffic will be reduced to one lane with a pilot car and flaggers positioned to move traffic through the work zone. Intersections may be closed as work proceeds through the project. 

 

Speed will be reduced to 25 mph throughout the project location. Flaggers and pilot cars will be present to assist in moving traffic through the work zone.

 

A width restriction of 9 ft will be in place during the gutter replacement for a minimum of about 1 week. Oil may be present on the roadway.

 

For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at travel.dot.nd.gov.  

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.