There were 116 press releases posted in the last 24 hours and 454,982 in the last 365 days.

Grant Marsh Bridge on I-94 scheduled for inspection next week

The North Dakota Department of Transportation will begin a bridge inspection on the Grant Marsh Bridge on I-94 between Bismarck and Mandan beginning Monday, August 10. The inspection will take place from approximately 8 a.m. until 4 p.m. each day.

During the inspection

  • A lane reduction will be in place in one direction
  • A width restriction of 16 feet will be in place through the work zone

The bridge inspection is expected to be completed in approximately two weeks.

The NDDOT would like to remind motorists to slow down and use caution throughout the work zone.

For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at http://www.dot.nd.gov/travel-info-v2/.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.