There were 1,107 press releases posted in the last 24 hours and 400,706 in the last 365 days.

Hunt Mining Concentrate Shipment From Martha Project

LIBERTY LAKE, Washington, March 26, 2019 (GLOBE NEWSWIRE) -- Hunt Mining Corp. (the “Corporation” or “Hunt”) (TSX VENTURE: “HMX” OTCQB: “HGLD”) is pleased to disclose the most recent concentrate shipment information from the Martha Mine Project (“Martha Project”) located in Santa Cruz Province, Argentina. The total, contained troy ounces of silver are 22,205 and 37 troy ounces of gold.  

March 2019 Shipment from Martha Project (based on Alex Stewart International outbound port assays)

Shipment Weight dmt Ag g/t grade & weighted average Au g/t grade & weighted average Silver (Troy Ounces) Gold (Troy Ounces)
March 17.954 38,468 64.6 22,205 37
  • Troy ounce = 31.1035 grams
  • dmt = dry metric tonne
  • g/t = grams per tonne
  • Silver and gold grades are based on independent sampling and assaying performed by Alex Stewart International, a global, independent, certified analytical services company. Rounding may result in differences in contained ounces

Donald J. Birak, an independent geologist, is the qualified person as defined by National Instrument 43-101 and has approved the scientific and technical content of this press release.

Additional information on the Martha Project and other Santa Cruz, Argentina projects can be viewed on the Company website at: www.huntmining.com.

About Hunt Mining

Hunt Mining Corp. has continued to develop its properties as an active and aggressive explorer in Santa Cruz since 2006. During that time, Hunt's wholly owned subsidiary, Cerro Cazador S.A., has completed exploration activity including 62,000 meters of HQ core drilling, 416 line kilometers of Induced Polarization geophysical surveys and more than 20,000 surface soil, sediment, channel, chip, and trench samples, beyond the historical work previous to the same properties. Hunt also owns a 100% interest in the Martha Mine, located in the Santa Cruz Province, Argentina.

For more information contact:

Dean Stuart
Investor Relations
T: (403) 617-7609
E: dean@boardmarker.net

Bob Little
Chief Administration Officer
T: (509) 290-5659
E: blittle@huntmining.com

Neither the TSX Venture nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture) accepts responsibility for the adequacy or accuracy of this release.

Martha - Ongoing activity at the Martha Project is being undertaken without established mineral resources or reserves and the Corporation has not established the economic viability of the operations on the Martha Project. As a result, there is increased uncertainty and economic risk of failure associated with these activities.  Hunt filed an updated NI 43-101 Technical Report (“Technical Report”) for the Martha Project, dated October 12, 2018 titled “Martha Silver and Gold Project, Santa Cruz, Argentina”, which is currently available on SEDAR and on the Corporation’s website at:

http://www.huntmining.com/sites/default/files/2018-10/MM%20TR_2018_HUNTMINING_12Oct18.pdf

huntminingcorp.jpg