Amur GPP to be supplied with heavy equipment from summer 2018
Background
Linde AG is one of the world’s largest companies focused on industrial technologies for natural gas treatment and separation with the recovery of ethane, propane and heavier hydrocarbon fractions. In addition, the company designs and builds cryogenic facilities for natural gas and helium liquefaction.
Gazprom’s Amur GPP will be the largest gas processing plant in Russia and one of the biggest in the world. It will have a design capacity of 42 billion cubic meters of gas per year. The plant will have six production lines, with the first two lines slated for commissioning in 2021. In addition to natural gas, the GPP will produce ethane, propane, butane, pentane-hexane fraction, and helium.
Linde supplies the Amur GPP with the core process equipment for cryogenic recovery of helium and valuable petrochemical substances from gas.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.
