Teranga Gold Files Technical Report for Sabodala

Lower Costs and Stronger Cash Flows Underpin New Life of Mine

/EINPresswire.com/ -- TORONTO, ONTARIO -- (Marketwired) -- 03/23/16 -- (All amounts are in U.S. dollars unless otherwise stated)

Teranga Gold Corporation ("Teranga" or the "Company") (TSX: TGZ)(ASX: TGZ) announces the filing of a National Instrument 43-101 Technical Report (the "Technical Report"), supporting the Company's updated life of mine ("LOM") plan released on January 29, 2016. The Technical Report titled "Technical Report on the Sabodala Project, Senegal, West Africa", which was prepared by Teranga and RPA Inc. and conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects, has been filed on SEDAR at www.sedar.com and on the Company's website at www.terangagold.com.

"A long-life, low-cost reserve base and strong cash flow underpin our new updated life of mine plan which projects undiscounted cash flows of $549 million(1)," said Richard Young, President and Chief Executive Officer. "We believe the upside potential on this base case plan is significant. With the only operating mill in Senegal and a large land package on an emerging world-class gold belt, we are focused on continuing to convert resources to reserves and to make new discoveries. Since our IPO at the end of 2010, we have increased our reserve base net of five years' production, by 80 per cent, through acquisition and exploration."

Highlights of the Technical Report


--  Large, 13.5-year mine life


----------------------------------------------------------------------------
Open pit and underground mineral resources and
 reserves summary                                              Au      Grade
(December 31, 2015)(2)                                      (Moz)   (g/t Au)
----------------------------------------------------------------------------
Proven and Probable Reserves (2P) at $1,100/oz Au            2.63       1.38
  Open Pit(i)                                                1.90       1.41
  Underground(i)                                             0.35       5.01
  Stockpiles                                                 0.39       0.79
Measured and Indicated Resources (inclusive of
 Reserves)                                                   4.44       1.62
Inferred Resources                                           0.94       1.92
----------------------------------------------------------------------------
(i)Average mined grade is 1.59 g/t Au for both open pit and underground
 reserves.
Note: Refer to Appendix 1 and Appendix 2 for full Mineral Reserve and
 Resource tables.
----------------------------------------------------------------------------

--  Solid LOM production profile with gold production expected to average
    over 200,000 ounces per annum through 2024. Sequencing of multiple open
    pits designed to maximize annual cash flow at an $1,100 gold price per
    ounce(3).
--  LOM all-in sustaining costs of $887 per ounce(4) and, when including the
    cost of the Franco-Nevada gold stream, $960 per ounce(4). Low sustaining
    capex of less than $10 million per annum over LOM.
--  Strong cash flow of $240 per ounce(5) at a $1,200 per ounce gold price.
--  Significant organic growth potential on emerging world-class gold belt
    where more than 50 million ounces have been identified(6).

Endnotes


1.  For Teranga, life of mine cash flows from the Sabodala project are
    derived from the Company's NI 43-101 Technical Report filed on Sedar as
    of March 23, 2016 and are determined as follows: Forecasted revenues
    from production over the life of mine total $2,830 million (See Appendix
    3 - Life of Mine Plan - 215,000 ounces at $1,100 per ounce and 2,154,000
    ounces at $1,200 per ounce, see also Table 16-8 of the Technical Report
    on page 16-14) less anticipated life of mine all-in sustaining cash
    costs of $2,281 million (See Appendix 5 herein and Table 21-8 on page
    21-15 of the Technical Report) for undiscounted cash flows totalling
    $549 million before interest payments, income tax payments, repayment of
    debt, working capital, closure costs and dividends. On a discounted
    basis the present value of these life of mine cash flows would be $376
    million at 5% and $307 million at 8%. Using an exchange rate of
    0.7USD:1CAD, undiscounted life of mine cash flows total C$784 million,
    and on a discounted basis, C$537 million at 5% and C$439 million at 8%.

2.  Mineral Reserves and Mineral Resources estimates as at December 31, 2015
    as per Company disclosure. For more information regarding Teranga Gold's
    Mineral Reserves and Resources, please refer to Teranga Gold's December
    Quarter and Year-end 2015 Report accessible on the Company's website at
    www.terangagold.com.

3.  This production guidance is based on existing proven and probable
    reserves only from the Sabodala mining license as disclosed in Teranga
    Gold's December Quarter and Year-end 2015 Report accessible on the
    Company's website at www.terangagold.com.

4.  Total cash costs figures are calculated in accordance with a standard
    developed by The Gold Institute, which was a worldwide association of
    suppliers of gold and gold products and included leading North American
    gold producers. The Gold Institute ceased operations in 2002, but the
    standard is considered the accepted standard of reporting cash cost of
    production in North America. Adoption of the standard is voluntary and
    the cost measures presented may not be comparable to other similarly
    titled measure of other companies. The World Gold Council ("WGC")
    definition of all-in sustaining costs seeks to extend the definition of
    total cash costs by adding corporate general and administrative costs,
    reclamation and remediation costs (including accretion and
    amortization), exploration and study costs (capital and expensed),
    capitalized stripping costs and sustaining capital expenditures and
    represents the total costs of producing gold from current operations.
    All-in sustaining cost excludes income tax payments, interest costs,
    costs related to business acquisitions and items needed to normalize
    earnings. Consequently, this measure is not representative of all of the
    Company's cash expenditures. In addition, the calculation of all-in
    sustaining costs does not include depreciation expense as it does not
    reflect the impact of expenditures incurred in prior periods. Therefore,
    it is not indicative of the Company's overall profitability. Life of
    mine total cash costs and all-in sustaining costs figures used in this
    release are before stockpile inventory value adjustments and government
    waiver accruals. For more information regarding these measures, please
    refer to the Company's 2015 Annual Management's Discussion and Analysis
    accessible on the Company's website at www.terangagold.com.

5.  Cash flow per ounce is based on the Company's life of mine average all-
    in sustaining costs as set out in the Company's most recent NI 43-101
    Technical Report before income tax payments, interest payments, debt
    repayments, closure costs, dividends and working capital deducted
    against a forecast gold price of $1,200 per ounce for 2017 and beyond.

6.  Identified ounces on the Birimian greenstone belt, which straddles the
    border of Senegal and Mali, West Africa, refers to gold ounces
    historically mined in addition to gold ounces currently reported as
    Measured and Indicated Resources, as available on GFMS Thomson Reuters
    and the latest company reserve and resource statements as of March 23,
    2016.

Competent and Qualified Persons Statement

The technical information contained in this document relating to the open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. William Paul Chawrun, P. Eng who is a member of the Professional Engineers Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Mr. Chawrun is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. However, he is a "Qualified Person" as defined in NI 43-101. Mr. Chawrun has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Chawrun is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Chawrun has consented to the inclusion in this Report of the matters based on his compiled information in the form and context in which it appears in this Report.

The technical information contained in this Report relating to mineral resource estimates is based on, and fairly represents, information compiled by Ms. Patti Nakai-Lajoie. Ms. Nakai-Lajoie, P. Geo., is a Member of the Association of Professional Geoscientists of Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Ms. Nakai-Lajoie is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. Ms. Nakai-Lajoie has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Ms. Nakai-Lajoie is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion in this Report of the matters based on her compiled information in the form and context in which it appears in this Report.

Teranga's exploration programs are being managed by Peter Mann, FAusIMM. Mr. Mann is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. Mr. Mann has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Mann is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. The technical information contained in this news release relating exploration results are based on, and fairly represents, information compiled by Mr. Mann. Mr. Mann has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The RC samples are prepared at site and assayed in the SGS laboratory located at the site. Analysis for diamond drilling is sent for fire assay analysis at ALS Johannesburg, South Africa. Mr. Mann has consented to the inclusion in this news release of the matters based on his compiled information in the form and context in which it appears herein.

The technical information contained in this document relating to the underground mineral reserves estimates is based on, and fairly represents, information compiled by Jeff Sepp, P. Eng who is a member of the Professional Engineers Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Mr. Sepp is independent of Teranga and is a "Qualified Person" as defined in NI 43-101 and a "competent person" as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Sepp has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Sepp has consented to the inclusion in this Report of the matters based on his compiled information in the form and context in which it appears in the Technical Report.

Teranga's disclosure of mineral reserve and mineral resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ("CIM Standards"). CIM definitions of the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", are substantially similar to the 2012 JORC Code corresponding definitions of the terms "ore reserve", "proved ore reserve", "probable ore reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", respectively. Estimates of mineral resources and mineral reserves prepared in accordance with the 2012 JORC Code would not be materially different if prepared in accordance with the CIM definitions applicable under NI 43-101. There can be no assurance that those portions of mineral resources that are not mineral reserves will ultimately be converted into mineral reserves.

Forward Looking Statements

This release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Teranga, or developments in Teranga's business or in its industry, to differ materially from the anticipated results, performance, achievements or developments expressed or implied by such forward-looking statements. Forward-looking statements include, without limitation, all disclosure regarding possible events, conditions or results of operations, future economic conditions and courses of action, the proposed plans with respect to mine plan, anticipated 2016 results, mineral reserve and mineral resource estimates, anticipated life of mine operating and financial results, and the completion of construction of the Gora deposit related thereto. Such statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions and its expectations of future developments that management believe to be reasonable and relevant. These assumptions include, among other things, the ability to obtain any requisite Senegalese governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic conditions and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements, which speak only as of the date they are made. The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other factors, such as project execution delays, many of which are beyond the control of Teranga, as well as other risks and uncertainties which are more fully described in the revised Company's Annual Information Form dated September 1, 2015, and in other company filings with securities and regulatory authorities which are available at www.sedar.com. Teranga does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Nothing in this report should be construed as either an offer to sell or a solicitation to buy or sell Teranga securities.

About Teranga

Teranga is a Canadian-based gold company listed on the Toronto Stock Exchange (TSX: TGZ) and Australian Securities Exchange (ASX: TGZ). Teranga is principally engaged in the production and sale of gold, as well as related activities such as exploration and mine development in Senegal, West Africa.

Teranga's mission is to create value for all of its stakeholders through responsible mining. Its vision is to explore, discover and develop gold mines in Senegal and West Africa, in accordance with the highest international standards, and to be a catalyst for sustainable economic, environmental and community development. All of its actions from exploration, through development, operations and closure will be based on the best available techniques. For more information, please refer to www.terangagold.com.

APPENDICES

APPENDIX 1: Open Pit and Underground Mineral Resources Summary as at December 31, 2015


----------------------------------------------------------------------------
Deposit          Domain              Measured               Indicated
                             -----------------------------------------------
                              Tonnes   Grade      Au  Tonnes   Grade      Au
                             -----------------------------------------------
                                        (g/t                    (g/t
                             ('000s)     Au) ('000s) ('000s)     Au) ('000s)
----------------------------------------------------------------------------
Sabodala         Open Pit     13,742    1.13     497   6,488    1.59     332

                 Underground                           1,631    3.65     191
                 Combined     13,742    1.13     497   8,119    2.01     524
----------------------------------------------------------------------------
Gora             Open Pit        466    4.55      68   1,083    6.11     213

                 Underground                             315    5.14      52
                 Combined        466    4.55      68   1,398    5.89     265
----------------------------------------------------------------------------
Niakafiri Main   Open Pit      4,909    1.33     210   7,222    0.98     228

                 Underground
                 Combined      4,909    1.33     210   7,222    0.98     228
----------------------------------------------------------------------------
Niakafiri West   Open Pit

                 Underground
                 Combined
----------------------------------------------------------------------------
Soukhoto         Open Pit

                 Underground
                 Combined
----------------------------------------------------------------------------
Diadiako         Open Pit

                 Underground
                 Combined
----------------------------------------------------------------------------
Subtotal
 Sabodala ML     Open Pit     19,117    1.26     776  14,793    1.62     773

                 Underground                           1,947    3.89     243
                 Combined     19,117    1.26     776  16,740    1.89   1,016
----------------------------------------------------------------------------
Masato           Open Pit      5,894    0.79     150  22,617    1.16     844

                 Underground                           1,163    2.75     103
                 Combined      5,894    0.79     150  23,780    1.24     947
----------------------------------------------------------------------------
Golouma          Open Pit                              6,800    2.98     653

                 Underground                           2,134    4.09     280
                 Combined                              8,934    3.25     933
----------------------------------------------------------------------------
Kerekounda       Open Pit                              1,255    4.28     173

                 Underground                             499    4.88      78
                 Combined                              1,755    4.45     251
----------------------------------------------------------------------------
Maki Medina      Open Pit                              2,112    1.22      83

                 Underground                             109    2.71      10
                 Combined                              2,221    1.30      93
----------------------------------------------------------------------------
Niakafiri SW     Open Pit                                770    0.81      20

                 Underground
                 Combined                                770    0.81      20
----------------------------------------------------------------------------
Niakafiri SE     Open Pit                              4,439    0.98     140

                 Underground                              73    2.60       6
                 Combined                              4,512    1.01     146
----------------------------------------------------------------------------
Kinemba          Open Pit                                 24    1.06       1

                 Underground
                 Combined                                 24    1.06       1
----------------------------------------------------------------------------
Kobokoto         Open Pit                                842    1.02      28

                 Underground
                 Combined                                842    1.02      28
----------------------------------------------------------------------------
Koulouqwinde     Open Pit

                 Underground
                 Combined
----------------------------------------------------------------------------
Kourouloulou     Open Pit                                 96   11.51      36

                 Underground                              59    9.15      18
                 Combined                                156   10.61      53
----------------------------------------------------------------------------
Kouroundi        Open Pit                                 67    0.93       2

                 Underground
                 Combined                                 67    0.93       2
----------------------------------------------------------------------------
Koutouniokolla   Open Pit

                 Underground
                 Combined
----------------------------------------------------------------------------
Mamasato         Open Pit                                560    1.45      26

                 Underground
                 Combined                                560    1.45      26
----------------------------------------------------------------------------
Sekoto           Open Pit

                 Underground
                 Combined
----------------------------------------------------------------------------
Subtotal Somigol
 ML              Open Pit      5,894    0.79     150  39,584    1.58   2,005

                 Underground                           4,038    3.81     495
                 Combined      5,894    0.79     150  43,622    1.78   2,500
----------------------------------------------------------------------------
Total Sabodala +
 Somigol         Open Pit     25,011    1.15     926  54,377    1.59   2,777

                 Underground                           5,985    3.84     738
                 Combined     25,011    1.15     926  60,362    1.81   3,516
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Deposit          Domain       Measured and Indicated         Inferred
                            ------------------------------------------------
                              Tonnes   Grade      Au  Tonnes   Grade      Au
                            ------------------------------------------------
                                        (g/t                    (g/t
                             ('000s)     Au) ('000s) ('000s)     Au) ('000s)
----------------------------------------------------------------------------
Sabodala         Open Pit     20,230    1.28     829   2,525    1.23     100

                 Underground   1,631    3.65     191     460    3.60      53
                 Combined     21,861    1.45   1,021   2,985    1.60     153
----------------------------------------------------------------------------
Gora             Open Pit      1,549    5.64     281      53    4.95       8

                 Underground     315    5.14      52      59    4.83       9
                 Combined      1,864    5.56     333     113    4.88      18
----------------------------------------------------------------------------
Niakafiri Main   Open Pit     12,131    1.12     438   2,472    1.09      87

                 Underground                             184    2.51      15
                 Combined     12,131    1.12     438   2,656    1.19     102
----------------------------------------------------------------------------
Niakafiri West   Open Pit                              2,566    1.29     107

                 Underground                              90    2.82       8
                 Combined                              2,656    1.34     115
----------------------------------------------------------------------------
Soukhoto         Open Pit                                550    1.46      26

                 Underground
                 Combined                                550    1.46      26
----------------------------------------------------------------------------
Diadiako         Open Pit                                178    1.27       7

                 Underground                             663    2.89      61
                 Combined                                841    2.54      69
----------------------------------------------------------------------------
Subtotal
 Sabodala ML     Open Pit     33,910    1.42   1,548   8,344    1.25     335

                 Underground   1,947    3.89     243   1,456    3.14     147
                 Combined     35,857    1.55   1,792   9,800    1.53     482
----------------------------------------------------------------------------
Masato           Open Pit     28,511    1.08     994

                 Underground   1,163    2.75     103   1,984    2.85     182
                 Combined     29,674    1.15   1,097   1,984    2.85     182
----------------------------------------------------------------------------
Golouma          Open Pit      6,800    2.98     653      88    2.46       7

                 Underground   2,134    4.09     280     854    3.66     100
                 Combined      8,934    3.25     933     942    3.55     107
----------------------------------------------------------------------------
Kerekounda       Open Pit      1,255    4.28     173

                 Underground     499    4.88      78     235    5.70      43
                 Combined      1,755    4.45     251     235    5.70      43
----------------------------------------------------------------------------
Maki Medina      Open Pit      2,112    1.22      83     114    0.81       3

                 Underground     109    2.71      10      85    2.54       7
                 Combined      2,221    1.30      93     199    1.55      10
----------------------------------------------------------------------------
Niakafiri SW     Open Pit        770    0.81      20      30    0.67       1

                 Underground
                 Combined        770    0.81      20      30    0.67       1
----------------------------------------------------------------------------
Niakafiri SE     Open Pit      4,439    0.98     140     162    0.96       5

                 Underground      73    2.60       6      16    2.64       1
                 Combined      4,512    1.01     146     177    1.11       6
----------------------------------------------------------------------------
Kinemba          Open Pit         24    1.06       1      91    0.95       3

                 Underground                              56    2.52       5
                 Combined         24    1.06       1     147    1.55       7
----------------------------------------------------------------------------
Kobokoto         Open Pit        842    1.02      28     335    0.86       9

                 Underground
                 Combined        842    1.02      28     335    0.86       9
----------------------------------------------------------------------------
Koulouqwinde     Open Pit                                230    1.42      11

                 Underground                              60    2.67       5
                 Combined                                290    1.68      16
----------------------------------------------------------------------------
Kourouloulou     Open Pit         96   11.51      36      22    6.71       5

                 Underground      59    9.15      18      86   13.58      38
                 Combined        156   10.61      53     108   12.18      42
----------------------------------------------------------------------------
Kouroundi        Open Pit         67    0.93       2      42    0.74       1

                 Underground
                 Combined         67    0.93       2      42    0.74       1
----------------------------------------------------------------------------
Koutouniokolla   Open Pit                                 85    1.58       4

                 Underground                              22    2.54       2
                 Combined                                108    1.78       6
----------------------------------------------------------------------------
Mamasato         Open Pit        560    1.45      26     305    1.25      12

                 Underground                              42    2.32       3
                 Combined        560    1.45      26     347    1.38      15
----------------------------------------------------------------------------
Sekoto           Open Pit                                485    0.89      14

                 Underground                              25    2.11       2
                 Combined                                510    0.95      16
----------------------------------------------------------------------------
Subtotal Somigol
 ML              Open Pit     45,478    1.47   2,155   1,989    1.16      74

                 Underground   4,038    3.81     495   3,465    3.48     387
                 Combined     49,516    1.66   2,650   5,454    2.63     462
----------------------------------------------------------------------------
Total Sabodala +
 Somigol         Open Pit     79,388    1.45   3,703  10,333    1.23     409

                 Underground   5,985    3.84     738   4,921    3.38     534
                 Combined     85,373    1.62   4,441  15,254    1.92     944
----------------------------------------------------------------------------

Notes for Mineral Resources Summary:


1.  CIM definitions were followed for Mineral Resources.
2.  Open pit oxide Mineral Resources are estimated at a cut-off grade of
    0.35 g/t Au, except for Gora at 0.48 g/t Au.
3.  Open pit transition and fresh rock Mineral Resources are estimated at a
    cut-off grade of 0.40 g/t Au, except for Gora at 0.55 g/t Au.
4.  Underground Mineral Resources are estimated at a cut-off grade of 2.00
    g/t Au.
5.  Measured Resources at Sabodala include stockpiles which total 9.2 Mt at
    0.77 g/t Au for 229,000 oz.
6.  Measured Resources at Gora include stockpiles which total 0.1 Mt at 1.30
    g/t Au for 6,000 oz.
7.  Measured Resources at Masato include stockpiles which total 5.9 Mt at
    0.79 g/t Au for 150,000 oz.
8.  High grade assays were capped at grades ranging from 1.5 g/t Au to 110
    g/t Au.
9.  The figures above are "Total" Mineral Resources and include Mineral
    Reserves.
10. Open pit shells were used to constrain open pit resources.
11. Mineral Resources are estimated using a gold price of US$1,450 per
    ounce.
12. Sum of individual amounts may not equal due to rounding.

There have been no revisions to the resource models for 2015, except for adjustments due to mining depletion and minor revisions to Niakafiri Main, Niakafiri SW, Maki Medina and Diadiako. For estimating 2015 Mineral Resources, Teranga has implemented a new reporting procedure, which includes the use of open pit shells to constrain open pit resources and reporting underground resources separately.

For reporting of open pit Mineral Resources, open pit shells were produced for each of the resource models using Whittle open pit optimization software. Only classified blocks greater than or equal to the open pit cut-off grades and within the open pit shells were reported. This is in compliance with the CIM (2014) resource definition requirement of "reasonable prospects for eventual economic extraction".

For reporting of underground Mineral Resources, only classified blocks greater than or equal to the underground cut-off grade outside of the open pit shells were reported. This is in compliance with CIM (2014) resource definition requirements. In addition, Deswik Stope Optimizer software was used to generate wireframe models to constrain blocks satisfying minimum size and continuity criteria, which were used for reporting Sabodala underground Mineral Resources.

The significant change between the Mineral Resources reported for 2014 and 2015 is due to this new reporting procedure, where the 2015 year end Mineral Resources have been constrained using open pit shells along with revised gold cut-off grades for both open pit and underground resources. Previously classified Mineral Resources that do not satisfy the revised reporting criteria for 2015 have been excluded, however, remain in the block models as mineralized material.

APPENDIX 2: Open Pit and Underground Mineral Reserves Summary


----------------------------------------------------------------------------
Deposits             Proven              Probable        Proven and Probable
              --------------------------------------------------------------
              Tonnes  Grade     Au Tonnes  Grade     Au Tonnes  Grade     Au
                (Mt)  (g/t)  (Moz)   (Mt)  (g/t)  (Moz)   (Mt)  (g/t)  (Moz)
----------------------------------------------------------------------------
Sabodala        1.57   1.57   0.08   2.33   1.36   0.10   3.90   1.44   0.18
Gora            0.31   4.94   0.05   1.15   4.74   0.17   1.46   4.78   0.22
Niakafiri
 Main           4.06   1.23   0.16   3.41   0.94   0.10   7.47   1.10   0.26
----------------------------------------------------------------------------
  Subtotal ML   5.95   1.52   0.29   6.88   1.71   0.38  12.83   1.62   0.67
----------------------------------------------------------------------------
Masato             -      -      -  21.41   1.06   0.73  21.41   1.06   0.73
Golouma West       -      -      -   3.23   1.96   0.20   3.23   1.96   0.20
Golouma South      -      -      -   1.27   3.09   0.13   1.27   3.09   0.13
Kerekounda         -      -      -   0.79   3.44   0.09   0.79   3.44   0.09
Maki Medina        -      -      -   0.90   1.17   0.03   0.90   1.17   0.03
Niakafiri SE       -      -      -   1.12   1.09   0.04   1.12   1.09   0.04
Niakafiri SW       -      -      -   0.37   0.92   0.01   0.37   0.92   0.01
----------------------------------------------------------------------------
     Subtotal
      SOMIGOL      -      -      -  29.08   1.32   1.23  29.08   1.32   1.23
----------------------------------------------------------------------------
Subtotal Open
          Pit   5.95   1.52   0.29  35.96   1.39   1.61  41.92   1.41   1.90
----------------------------------------------------------------------------
Golouma West
 1                 -      -      -   0.62   6.07   0.12   0.62   6.07   0.12
Golouma West
 2                 -      -      -   0.45   4.39   0.06   0.45   4.39   0.06
Golouma South      -      -      -   0.47   4.28   0.06   0.47   4.28   0.06
Kerekounda         -      -      -   0.61   4.95   0.10   0.61   4.95   0.10
----------------------------------------------------------------------------
     Subtotal
  Underground   0.00   0.00      -   2.15   5.01   0.35   2.15   5.01   0.35
----------------------------------------------------------------------------
        Total   5.95   1.52   0.29  38.11   1.60   1.96  44.07   1.59   2.25
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Stockpiles     15.27   0.79   0.39   0.00   0.00   0.00  15.27   0.79   0.39
----------------------------------------------------------------------------
Total
 Including
 Stockpile     21.23   0.99   0.68  38.11   1.60   1.96  59.34   1.38   2.63
----------------------------------------------------------------------------

Notes for Mineral Reserves Summary:


1.  CIM definitions were followed for Mineral Reserves.
2.  Mineral Reserve cut off grades for range from are 0.35 g/t to 0.63 g/t
    Au for oxide and 0.42 g/t to 0.73 g/t Au for fresh based on a $1,100/oz
    gold price
3.  Mineral Reserve cut off grades for Sabodala 0.45 g/t for oxide and 0.55
    g/t for fresh based on a $1,100/oz gold price
4.  Underground reserves cut-off grades ranged from 2.3-2.6 g/t based on
    $1,200/oz gold price
5.  Sum of individual amounts may not equal due to rounding.
6.  The Niakafiri Main deposit is adjacent to the Sabodala village and
    relocation of at least some portion of the village will be required
    which will necessitate a negotiated resettlement program with the
    affected community members.

APPENDIX 3: Life of Mine (2016 to 2029)


----------------------------------------------------------------------------
                                   2016-
                                    2020
                        Unit   LOM   AVG  2016  2017  2018  2019  2020  2021
----------------------------------------------------------------------------
Sabodala    Ore Mined     Mt   3.9               0.3   1.5   2.0

            Ore Grade    g/t  1.44              1.11  1.33  1.58
            Contained
             Oz          Moz  0.18              0.01  0.07  0.10
            Waste         Mt  31.0              11.1  15.0   5.0
----------------------------------------------------------------------------
Masato      Ore Mined     Mt  21.4         0.5         0.7   0.4   1.1   2.8

            Ore Grade    g/t  1.06        1.10        0.74  0.70  0.86  0.93
            Contained
             Oz          Moz  0.73        0.02        0.02  0.01  0.03  0.09
            Waste         Mt 110.2         0.2        16.2   5.8  19.4  27.2
----------------------------------------------------------------------------
Gora        Ore Mined     Mt   1.5         0.7   0.7   0.1

            Ore Grade    g/t  4.78        4.00  5.15  7.90
            Contained
             Oz          Moz  0.22        0.08  0.12  0.02
            Waste         Mt  32.2        17.9  14.1   0.2
----------------------------------------------------------------------------
Kerekounda  Ore Mined     Mt   0.8         0.0   0.5   0.3

            Ore Grade    g/t  3.44        0.99  3.39  3.74
            Contained
             Oz          Moz  0.09        0.00  0.06  0.03
            Waste         Mt  18.2         3.6  13.0   1.6
----------------------------------------------------------------------------
Golouma     Ore Mined     Mt   4.5         1.2               0.9   2.4   0.1

            Ore Grade    g/t  2.28        3.08              1.98  1.99  2.24
            Contained
             Oz          Moz  0.33        0.12              0.06  0.15  0.00
            Waste         Mt  49.6        14.8              18.4  16.4   0.0
----------------------------------------------------------------------------
Niakafiri(1
 )          Ore Mined     Mt   9.0                           1.5

            Ore Grade    g/t  1.09                          1.05
            Contained
             Oz          Moz  0.31                          0.05
            Waste         Mt  26.6                           6.2
----------------------------------------------------------------------------
Maki Medina Ore Mined     Mt   0.9                     0.9

            Ore Grade    g/t  1.17                    1.17
            Contained
             Oz          Moz  0.03                    0.03
            Waste         Mt   2.9                     2.9
----------------------------------------------------------------------------
Underground Ore Mined     Mt   2.1                                       0.1

            Ore Grade    g/t  5.01                                      5.00
            Contained
             Oz          Moz  0.35                                      0.02
----------------------------------------------------------------------------
Summary     Ore Mined     Mt  44.1   3.1   2.3   1.6   3.4   4.7   3.5   3.0

            Ore Grade    g/t  1.59  1.94  2.91  3.74  1.51  1.42  1.63  1.09
            Contained
             Oz          Moz  2.25  0.20  0.22  0.19  0.17  0.22  0.19  0.10
            Waste         Mt 270.7  36.3  36.4  38.2  35.9  35.4  35.8  27.2
            Movement      Mt 314.7  39.5  38.7  39.8  39.3  40.1  39.4  30.2
----------------------------------------------------------------------------
            Stockpile
             Ore
             Balance      Mt              13.7  11.1  10.1  10.4   9.4   7.9
            Stockpile
             Grade       g/t              0.82  0.84  0.76  0.73  0.70  0.68
            Contained
             Oz          Moz              0.36  0.30  0.25  0.24  0.21  0.17
----------------------------------------------------------------------------

----------------------------------------------------------------------------
            Ore Milled    Mt  59.3   4.3   3.9   4.2   4.5   4.5   4.5   4.5
            Head Grade   g/t  1.38  1.66  1.93  1.85  1.56  1.54  1.46  0.99
            Oxide          %   21%   27%   37%   25%   26%   31%   19%   28%
            Produced
             Oz          Moz 2.376 0.207 0.215 0.229 0.202 0.200 0.190 0.128
----------------------------------------------------------------------------
Notes:
(1) The schedule summarized Niakafiri from "Niakafiri Main" and "Niakafiri
 SE". The portion of Niakafiri SE to be mined lies outside of the Sabodala
 Village area and assumes relocation is not required.
Sum of individual amounts may not equal due to rounding.
The estimated ore reserves underpinning the production targets (as defined
 in the ASX Listing Rules) set out in Appendix 1 above, have been prepared
 by Mr. Paul Chawrun, who is a Competent Person, in accordance with the
 requirements of the 2012 JORC Code.
This production guidance is based on existing proven and probable ore
 reserves from the Sabodala mining license as at December 31, 2015.
Stockpile balances at January 1, 2016 included 15.3 Mt at 0.79 g/t for 0.39
 million contained ounces
----------------------------------------------------------------------------

----------------------------------------------------------------------
                        2022  2023  2024  2025  2026  2027  2028  2029
----------------------------------------------------------------------
Sabodala    Ore Mined

            Ore Grade
            Contained
             Oz
            Waste
----------------------------------------------------------------------
Masato      Ore Mined    5.0   4.3   6.7

            Ore Grade   1.00  1.02  1.27
            Contained
             Oz         0.16  0.14  0.27
            Waste       21.5  11.6   8.2
----------------------------------------------------------------------
Gora        Ore Mined

            Ore Grade
            Contained
             Oz
            Waste
----------------------------------------------------------------------
Kerekounda  Ore Mined

            Ore Grade
            Contained
             Oz
            Waste
----------------------------------------------------------------------
Golouma     Ore Mined

            Ore Grade
            Contained
             Oz
            Waste
----------------------------------------------------------------------
Niakafiri(1
 )          Ore Mined          4.0   3.5

            Ore Grade         1.10  1.10
            Contained
             Oz               0.14  0.12
            Waste             12.5   7.9
----------------------------------------------------------------------
Maki Medina Ore Mined

            Ore Grade
            Contained
             Oz
            Waste
----------------------------------------------------------------------
Underground Ore Mined    0.3   0.3   0.3   0.1   0.2   0.4   0.4   0.2

            Ore Grade   4.95  4.63  4.33  4.39  5.55  5.36  5.52  4.76
            Contained
             Oz         0.05  0.05  0.04  0.01  0.03  0.06  0.07  0.02
----------------------------------------------------------------------
Summary     Ore Mined    5.3   8.6  10.4   0.1   0.2   0.4   0.4   0.2

            Ore Grade   1.22  1.20  1.29  4.39  5.55  5.36  5.52  4.76
            Contained
             Oz         0.21  0.33  0.43  0.01  0.03  0.06  0.07  0.02
            Waste       21.5  24.2  16.1
            Movement    26.8  32.8  26.5   0.1   0.2   0.4   0.4   0.2
----------------------------------------------------------------------
            Stockpile
             Ore
             Balance     8.7  12.9  18.9  14.5  10.2   6.2   2.1
            Stockpile
             Grade      0.67  0.66  0.68  0.66  0.66  0.66  0.66
            Contained
             Oz         0.19  0.27  0.41  0.31  0.22  0.13  0.04
----------------------------------------------------------------------

----------------------------------------------------------------------
            Ore Milled   4.4   4.5   4.4   4.4   4.4   4.4   4.4   2.3
            Head Grade  1.35  1.73  2.06  0.82  0.85  1.06  1.09  0.94
            Oxide        16%   29%    0%   17%   19%   18%   18%   18%
            Produced
             Oz        0.173 0.225 0.263 0.104 0.109 0.135 0.139 0.063
----------------------------------------------------------------------
Notes:
(1) The schedule summarized Niakafiri from "Niakafiri Main" and
 "Niakafiri SE". The portion of Niakafiri SE to be mined lies outside
 of the Sabodala Village area and assumes relocation is not required.
Sum of individual amounts may not equal due to rounding.
The estimated ore reserves underpinning the production targets (as
 defined in the ASX Listing Rules) set out in Appendix 1 above, have
 been prepared by Mr. Paul Chawrun, who is a Competent Person, in
 accordance with the requirements of the 2012 JORC Code.
This production guidance is based on existing proven and probable ore
 reserves from the Sabodala mining license as at December 31, 2015.
Stockpile balances at January 1, 2016 included 15.3 Mt at 0.79 g/t for
 0.39 million contained ounces
----------------------------------------------------------------------

APPENDIX 4: Life of Mine Capital Expenditures


----------------------------------------------------------------------------
                                   2016-
                                    2020
Sustaining Capex       Unit    LOM   AVG  2016  2017  2018  2019  2020  2021
----------------------------------------------------------------------------
Open Pit Mining        USDM   29.9   3.7   4.9   3.5   4.0   1.5   4.7   6.0
Underground Mining     USDM      -     -     -     -     -     -     -     -
Processing             USDM   18.9   2.1   2.4   2.0   2.0   2.0   2.0   2.0
Admin & Other
 Sustaining            USDM    8.8   1.3   2.8   1.0   1.0   1.0   0.5   0.5
Community Relations    USDM   25.0   0.2   1.0     -     -     -     -   2.0
----------------------------------------------------------------------------
Total Sustaining Capex USDM   82.5   7.2  11.0   6.5   7.0   4.5   7.2  10.5
Capital Projects &
 Development
----------------------------------------------------------------------------
OJVG & Gora
 Development           USDM    4.3   0.9   3.3   0.8   0.3     -     -     -
Underground Equipment
 & Development         USDM  102.1   4.9     -     -     -     -  24.4  23.4
Other Projects &
 Development           USDM   21.8   2.9  11.3   1.9   1.4     -     -   7.2
----------------------------------------------------------------------------
Total Projects &
 Development           USDM  128.2   8.7  14.6   2.7   1.7     -  24.4  30.6
----------------------------------------------------------------------------
Combined Total (USDM)  USDM  210.8  15.9  25.7   9.2   8.7   4.5  31.6  41.1
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Sustaining Capex       Unit   2022  2023  2024  2025  2026  2027  2028  2029
----------------------------------------------------------------------------
Open Pit Mining        USDM    3.0   1.5   0.8     -     -     -     -     -
Underground Mining     USDM      -     -     -     -     -     -     -     -
Processing             USDM    2.0   1.0   1.0   1.0   0.5   0.5   0.5     -
Admin & Other
 Sustaining            USDM    0.5   0.3   0.3   0.3   0.3   0.3   0.3     -
Community Relations    USDM   15.0   7.0     -     -     -     -     -     -
----------------------------------------------------------------------------
Total Sustaining Capex USDM   20.5   9.8   2.1   1.3   0.8   0.8   0.8     -
Capital Projects &
 Development
----------------------------------------------------------------------------
OJVG & Gora
 Development           USDM      -     -     -     -     -     -     -     -
Underground Equipment
 & Development         USDM    8.9   2.4   0.8   8.5  18.2  10.4   4.1   0.9
Other Projects &
 Development           USDM      -     -     -     -     -     -     -     -
----------------------------------------------------------------------------
Total Projects &
 Development           USDM    8.9   2.4   0.8   8.5  18.2  10.4   4.1   0.9
----------------------------------------------------------------------------
Combined Total (USDM)  USDM   29.4  12.2   2.9   9.8  18.9  11.1   4.9   0.9
----------------------------------------------------------------------------

APPENDIX 5: Life of Mine Operating Costs


----------------------------------------------------------------------------
                                   2016-
                                    2020
Activity             Unit      LOM   AVG  2016  2017  2018  2019  2020  2021
----------------------------------------------------------------------------
                     USD/t
Open Pit Mining       mined   2.25  2.25  2.24  2.27  2.25  2.20  2.29  2.19
                     USD/t
Underground Mining    milled 72.23     -     -     -     -     -     - 76.30
                     USD/t
Processing            milled 10.33 10.16 10.83 10.02 10.00  9.93 10.09  9.97
                     USD/t
General & Admin.      milled  2.56  3.39  3.81  3.47  3.29  3.28  3.15  3.12
----------------------------------------------------------------------------
Mining               USDM      702    88    86    91    89    87    89    66
Underground Mining   USDM      155     -     -     -     -     -     -     7
Processing           USDM      613    44    42    43    45    44    45    44
General & Admin      USDM      144    14    14    14    14    14    14    14
Refining & Freight   USDM       12     1     1     1     1     1     1     1
Byproduct Credits    USDM      (4)   (0)   (0)   (0)   (0)   (0)   (0)   (0)
----------------------------------------------------------------------------
Total Operating
 Costs               USDM    1,622   147   142   148   148   146   148   132
----------------------------------------------------------------------------
Deferred Stripping
 Adjustment          USDM    (129)  (13)  (26)   (6)     -     -  (35)  (35)
Royalties(1)         USDM      145    13    13    16    12    12    11     8
----------------------------------------------------------------------------
Total Cash Costs(2)  USDM    1,639   146   130   158   161   159   124   104
----------------------------------------------------------------------------
Total Cash Costs(2)  USD/oz    690   706   602   691   798   792   655   810
----------------------------------------------------------------------------
Capex                USDM      211    16    26     9     9     5    32    41
Capitalized Deferred
 Stripping           USDM      129    13    26     6     -     -    35    35
Capitalized Reserve
 Development         USDM        -     -     -     -     -     -     -     -
Corporate Admin      USDM      130    14    16    14    14    14    12    10
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2)       USDM    2,108   189   196   187   183   177   203   190
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2)       USD/oz    887   914   912   819   908   882 1,072 1,483
----------------------------------------------------------------------------
Franco Nevada Stream USDM      173    19    20    22    22    22    11     7
Franco Nevada Stream USD/oz     73    92    92    94   107   108    58    58
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2) plus
 stream              USDM    2,281   208   216   209   205   198   214   198
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2 ) plus
 stream              USD/oz    960 1,006 1,004   914 1,015   990 1,129 1,541
----------------------------------------------------------------------------
Notes:
(1) Royalties include Government of Senegal royalties on total production
 and the NSR royalty due to Axmin on Gora production.
(2 ) Refer to endnote (4) on page 2 of this press release concerning the
 definition of total cash costs and all-in sustaining costs.
This production guidance is based on existing proven and probable reserves
 only from both the Sabodala mining license as disclosed in the Reserves and
 Resources section of this Report.
Key assumptions: Gold spot price/ounce - US$1,200, Light fuel oil -
 US$0.72/litre, Heavy fuel oil - US$0.43/litre, US/Euro exchange rate -
 $1.10
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Activity             Unit     2022  2023  2024  2025  2026  2027  2028  2029
----------------------------------------------------------------------------
                     USD/t
Open Pit Mining       mined   2.31  2.17  2.36     -     -     -     -     -
                     USD/t
Underground Mining    milled 74.94 73.32 77.25 79.72 76.46 66.49 64.35 78.11
                     USD/t
Processing            milled 10.14  9.95 10.84 10.63 10.60 10.61 10.61 10.60
                     USD/t
General & Admin.      milled  3.06  3.08  2.01  1.88  1.43  1.23  1.00  1.81
----------------------------------------------------------------------------
Mining               USDM       61    71    62     -     -     -     -     -
Underground Mining   USDM       22    26    20     7    13    24    25    12
Processing           USDM       45    44    48    47    47    47    47    25
General & Admin      USDM       13    13     8     8     6     5     4     4
Refining & Freight   USDM        1     1     1     1     1     1     1     0
Byproduct Credits    USDM      (0)   (0)   (0)   (0)   (0)   (0)   (0)   (0)
----------------------------------------------------------------------------
Total Operating
 Costs               USDM      141   154   139    63    66    77    76    41
----------------------------------------------------------------------------
Deferred Stripping
 Adjustment          USDM     (25)   (1)     -     -     -     -     -     -
Royalties(1)         USDM       10    14    16     6     7     8     8     4
----------------------------------------------------------------------------
Total Cash Costs(2)  USDM      127   167   154    69    73    85    85    45
----------------------------------------------------------------------------
Total Cash Costs(2)  USD/oz    730   741   587   660   668   629   607   711
----------------------------------------------------------------------------
Capex                USDM       29    12     3    10    19    11     5     1
Capitalized Deferred
 Stripping           USDM       25     1     -     -     -     -     -     -
Capitalized Reserve
 Development         USDM        -     -     -     -     -     -     -     -
Corporate Admin      USDM       10    10     6     6     6     5     4     4
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2)       USDM      191   190   163    85    98   101    94    50
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2)       USD/oz  1,103   843   621   812   897   748   671   788
----------------------------------------------------------------------------
Franco Nevada Stream USDM       10    13    15     6     6     8     8     4
Franco Nevada Stream USD/oz     58    58    58    58    58    58    58    58
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2) plus
 stream              USDM      201   203   178    91   104   109   102    53
----------------------------------------------------------------------------
All-In Sustaining
 Cash Costs(2 ) plus
 stream              USD/oz  1,161   900   678   870   955   806   729   846
----------------------------------------------------------------------------
Notes:
(1) Royalties include Government of Senegal royalties on total production
 and the NSR royalty due to Axmin on Gora production.
(2 ) Refer to endnote (4) on page 2 of this press release concerning the
 definition of total cash costs and all-in sustaining costs.
This production guidance is based on existing proven and probable reserves
 only from both the Sabodala mining license as disclosed in the Reserves and
 Resources section of this Report.
Key assumptions: Gold spot price/ounce - US$1,200, Light fuel oil -
 US$0.72/litre, Heavy fuel oil - US$0.43/litre, US/Euro exchange rate -
 $1.10
----------------------------------------------------------------------------

Contacts:
Teranga Gold Corporation
Richard Young
President & CEO
+1 416-594-0000
ryoung@terangagold.com

Teranga Gold Corporation
Trish Moran
Head of Investor Relations
+1 416-607-4507
tmoran@terangagold.com


Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.