Bullfrog Gold Summarizes Exploration/Development Progress and Plans at its Project in the Bullfrog Mining District of Nevada

GRAND JUNCTION, Colo., July 27, 2020 (GLOBE NEWSWIRE) -- via NetworkWire – Bullfrog Gold Corp (BFGC:OTCQB; BFG:CSE; 11B:FSE) (“Bullfrog”, “BFGC” or the “Company”) is pleased to summarize progress during the first half of 2020 and its exploration and development plans for the coming 12 months at the Bullfrog Project (“Project”) located 125 miles NW of Las Vegas, Nevada.    

Progress
A key event in 2020 was the C$2.0 million private placement completed in mid-January that funded Company and Project obligations while achieving main objectives while advancing the Project as follows:

  • Further defined and expanded potential resources and pit limits of the Mystery Hill (“MH”) area that is adjacent to the Bullfrog pit and the Montgomery-Shoshone (“MS”) pit.
     
  • Drilled two initial test holes in the new Paradise Ridge exploration target and confirmed the host rocks are identical to those in the Bullfrog deposit located one mile to the west.
     
  • Fulfilled the final work commitment for the Company to exercise its option to purchase the lands currently under lease from Barrick Bullfrog Inc.(“Barrick”).
     
  • Completed cultural surveys that specifically permitted drilling on the patented and unpatented lands in the Barrick lease/option.
     
  • Based on investor awareness efforts and drill program results, substantially increased the trading volume of Bullfrog’s shares on the Canadian Securities Exchange, the OTCQB Venture Market and the Frankfurt, Tradegate and other German exchanges. For reference, results from all 25 holes recently drilled are summarized in Table 1.

Project Plans
Subject to funding, exploration and development plans for the next 12 months mainly include:

  • Design the next drill program, secure the required permits, and complete another exploration and development drill program.
     
  • Perform additional tests on drill cuttings, core and bulk samples from several areas, depths and grades in the Bullfrog, MH and MS deposits to assess variabilities in recovery and ascertain the average 85% gold recovery recently achieved by using high pressure grinding rolls that produce finer leach feeds containing more micro-fractures than conventional crushing equipment.  

Table 1

Bullfrog Gold Assay Results
                       
                       
Hole No.  MH  Intervals, Feet  2   MH  Intervals, Meters 3 Gold  1 Silver   Total
  From To Length   From To Length g/t g/t   Depth, Ft
BM-20-1 0 135 135   0 41 41 0.420 2.26   230
includes  0 75 75   0 23 23 0.550 1.95    
                       
BM-20-2 0 85 85   0 26 26 0.332 1.04   300
includes  0 65 65   0 20 20 0.373 1.15    
                       
BM-20-3 160 195 35   49 59 11 0.260 0.33   400
                       
BH-20-4 250 265 15   76 81 5 0.353 1.54   625
  280 390 110   85 119 34 0.274 0.60    
  515 605 90   157 184 27 0.321 0.93    
                       
BH-20-5 330 355 25   101 108 8 0.261 1.22   730
  385 550 165   117 168 50 0.240 0.49    
  575 685 110   175 209 34 0.580 0.82    
                       
BH-20-8 115 130 15   35 40 5 1.133 0.21   470
  155 175 20   47 53 6 0.379 0.25    
                       
BH-20-6 295 655 360   90 200 110 0.41 0.61   750
includes  395 480 85   120 146 26 0.906 0.91    
                       
BH-20-7 150 175 25   46 53 8 3.229 3.36   240
BH-20-7A Not sampled -Lost hole                   260
                       
BH-20-9 75 95 20   23 29 6 0.534 0.91   640
  120 140 20   37 43 6 0.308 0.45    
  150 175 25   46 53 8 0.313 0.33    
  340 640 300   104 195 91 0.333 0.32    
                       
BH-20-14  0 40 40   0 12 12 0.223 0.30   400
  75 95 20   23 29 6 0.304 0.21    
  160 180 20   49 55 6 0.284 0.20    
  220 260 40   67 79 12 0.444 0.47    
  275 305 30   84 93 9 0.396 0.16    
  380 400 20   116 122 6 0.243 0.46    
                       
BH-20-15 35 130 95   11 40 29 0.286 0.26   540
  315 365 50   96 111 15 0.262 0.19    
  395 540 145   120 165 44 0.310 0.39    
                       
BH-20-10 135 180 45   41 55 14 2.416 2.19   660
includes 135 155 20   41 47 6 4.892 4.14    
  340 360 20   104 110 6 0.576 0.26    
                       
BH-20-11 90 130 40   27 40 12 0.297 0.20   660
  160 185 25   49 56 8 0.308 0.08    
  220 300 80   67 91 24 0.354 0.18    
  420 455 35   128 139 11 0.201 0.34    
                       
BH-20-12 105 170 65   32 52 20 0.353 0.33   460
  260 300 40   79 91 12 0.454 0.18    
                       
BH-20-13 0 70 70   0 21 21 0.244 0.28   560
  125 165 40   38 50 12 0.435 0.34    
  310 460 150   94 140 46 0.304 0.20    
                       
BH-20-18 15 35 20   5 11 6 0.231 0.21   350
  130 225 95   40 69 29 0.222 0.16    
  245 315 70   75 96 21 0.237 0.00    
                       
BH-20-19 0 115 115   0 35 35 0.437 0.30   350
includes  5 55 50   2 17 15 0.635 0.31    
  140 195 55   43 59 17 0.265 0.25    
  230 255 25   70 78 8 0.211 0.09    
                       
BM-20-20 560 605 40   171 184 12 0.302 0.76   700
                       
BM-20-21 325 525 200   99 160 61 0.775 7.25   720
includes  440 505 65   134 154 20 1.838 18.28    
                       
BM-20-22 0 20 20   0 6 6 0.333 5.23   620
  305 385 80   93 117 24 0.538 2.08    
includes  325 345 20   99 105 6 1.372 6.46    
Tot./ Wtd. Avg    3,285       1,001 0.439 1.05   10,665
BP-20-23  (620') and 24 (880')  No significant mineralization    Total Drilling   12165
1 Nominal gold cut off: 0.20 g/t. Could be lower with current gold prices and higher leach recovery. 
   Minimum 20 feet waste between mineral intervals. Maximum 20 feet waste within mineral intervals. 
As spatial data is not currently not available, mineral lengths are not true thicknesses. 
3  Rounded. Decimals not shown          BM= Monthgomery Shoshone, BH=Mystery Hill and BP=Paradise Ridge
  • Complete an independent preliminary economic analysis that would include capital and operating cost estimates, facility siting studies, updated resource estimates within an optimized pit plan and selection of the scenario that delivers the best Project financial performance.

As hole BM-20-22 intersected 24 meters at 0.54 g gold/t and 2.1 g silver/t  about 40 meters under the MS pit and the nearest hole along strike to the northeast is barren but 190 meters away,  two or more holes are planned in this area to test for significant potential extensions toward the northeast. No additional drilling is currently needed in the MH and Bullfrog pit areas. Several additional holes and related studies are planned to further define and test the Paradise Ridge exploration target as well as several other targets generated by the Company.

About Bullfrog Gold Corp. and Current Resources
Bullfrog Gold Corp. is a Delaware corporation that controls the commanding land and mineral positions in the Bullfrog Mine area where Barrick produced 2.3 million ounces of gold by mining and conventional milling beginning in 1989 and ending in 1999 when ore reserves were depleted. Measured and indicated (M&I) 43-101 compliant resources were estimated in mid-2017 by Tetra Tech Inc. at 525,000 ounces of gold, averaging 1.02 gold g/t in base case plans of the MS and Bullfrog pits, the latter of which included minor MH resources. Most of these resources are in the north extension to the Bullfrog pit. Inferred resources were estimated at 110,000 ounces of gold averaging 1.2 g/t, of which most were in the Mystery Hill area It is noted that the 3-year trailing average gold price is now $185 higher than the $1,200 average price used in 2017. The resource estimates were also based on a heap leach gold recovery of 72% compared to the average 85% leach test recoveries recently achieved on four bulk samples. Much additional technical and corporate information may be sourced at www.bullfroggold.com.

Quality Control/Quality Assurance
The drill program was designed by David Beling, CEO and P.E., and managed by Clive Bailey, CPG and Lead Consultant responsible for all aspects of field activities, geological services and quality assurance and control requirements. On-site personnel log and track all samples prior to sealing and shipping. Quality control is monitored by the insertion of blind, certified standard reference materials, duplicate splits, and blanks into each sample shipment. All samples are shipped to American Assay Laboratories (AAL) in Reno, Nevada, for preparation and assaying. AAL is independent of the Company, and its quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and duplicate samples. Upon receipt of all assays, additional field samples and pulps may be assayed by other labs to further validate and verify results. Mr. Beling has verified the data underlying the information disclosed herein, including sampling, analytical and test data, and reviewing the reports of AAL, methodologies, results and all procedures undertaken for quality assurance and quality control in a manner consistent with industry practice.

Cautionary Note Regarding Forward Looking Statements
This press release contains certain "Forward-Looking Statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein with respect to the objectives, plans and strategies of the Company and those preceded by or that include the words "believes," "expects," "given," "targets," "intends," "anticipates," "plans," "projects," "forecasts" or similar expressions, are forward-looking statements that involve various risks and uncertainties. Forward-looking information in this press release includes but is not limited to statements regarding increased liquidity for the Company’s shareholders and the application of metallurgical testing results.

Such forward-looking information and statements are based on numerous assumptions, including among others, the Company's ability to successfully maintain its listings, the stability of industry and market costs and trends and the Company's ability to obtain all regulatory approvals required for its planned objectives. Furthermore, by their very nature, forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, events, results, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information. Such risks, uncertainties and other factors include, without limitation, those related to: (a) adverse regulatory or legislative changes (b) market conditions, volatility and global economic conditions (c) industry-wide risks (d) the Company's inability to maintain or improve its competitive position and (e) the ability to obtain financing needed to fund the continued development of the Company's business.

We use certain terms in this valuation such as “mineralization” and “mineral inventory estimates” that are not defined in Canadian National Instrument 43-101; or recognized under the U.S. SEC Industry Guide 7. The Company is presently an exploration stage company. Exploration is highly speculative in nature, involves many risks, requires substantial expenditures, and may not result in the discovery of mineral deposits that can be mined profitably. Furthermore, the Company currently has no resources or reserves on any of its properties. As a result, there can be no assurance that such forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Additional information regarding important factors that could cause actual results to differ materially from the Company's expectations is disclosed in the Company's documents filed from time to time with the United States Securities & Exchange Commission. Investors are urged to consider closely the disclosures in our Form 10-K and other SEC filings, which can be obtained from the SEC’s website at https://www.sec.gov/edgar.shtml.

Qualified Person
David Beling, P.E. has 56 years of project and corporate experience in the mining industry and is a qualified person as defined by Canadian National Instrument 43-101 – Standards of Disclosure or Mineral Projects. Mr. Beling has prepared, supervised the preparation of, or approved the technical information that forms the basis of the Company’s disclosures, but is not independent of Bullfrog Gold Corp, as he is the CEO & President and holds common shares and incentive stock options of the Company.

For further information, please contact David Beling, CEO & President, at (970) 628-1670.

Corporate Communications:
InvestorBrandNetwork (IBN)
Los Angeles, California
www.InvestorBrandNetwork.com
310.299.1717 Office
Editor@InvestorBrandNetwork.com