Complete closure of Temporary Kapaʻa Bypass Road on May 27 and May 30

Posted on May 19, 2025 in Highways News, Main, News

 

LĪHUʻE, Hawaiʻi – The Hawai‘i Department of Transportation (HDOT) notifies the public of the full closure of the Temporary Kapa‘a Bypass Road (Route 5600) between mile post 0 to 1.0 from Kūhiō Highway to Olohena Road. The one-way southbound road will be closed on Tuesday, May 27 and Friday, May 30 from 8:30 a.m. to 3:30 p.m. Traffic will be detoured to Lehua Street.

The closure is necessary for crews to install new striping and pavement markers on the newly paved road.

If weather conditions don’t allow for the work, it will be done the following week on Monday, June 2 and Friday, June 6.

Variable message boards will be posted. For weekly Kaua‘i lane closures, go to  https://hidot.hawaii.gov/highways/roadwork/kauai/

 

 

Media contact:

HDOT Public Affairs Office

Phone: 808-587-2160

Email: [email protected]

This press release can be viewed online at: https://www.einpresswire.com/article/814093736/

Disclaimer: If you have any questions regarding information in this press release please contact the company listed in the press release. Please do not contact EIN Presswire. We will be unable to assist you with your inquiry. EIN Presswire disclaims any content contained in these releases.

© 1995-2026 Newsmatics Inc. All Right Reserved.