There were 1,155 press releases posted in the last 24 hours and 469,696 in the last 365 days.

Geotechnical work to be conducted on and along roadways in Central Maui

Posted on Mar 7, 2025 in Highways News, Main, News

KAHULUIHawai‘i – The Hawai‘i Department of Transportation (HDOT) notifies highway users of potential traffic delays from March 10-14 as crews will be drilling for soil samples in and along state highways, which will assist the department in maintaining and improving its roadways.

Monday, March 10: work will be conducted on the east side shoulders of the Haleakalā Highway (Route 37) and Hāna Highway (Route 36) intersections from 8:30 a.m. to 3 p.m. There will be no lane closures. See: https://hidot.hawaii.gov/wp-content/uploads/2025/03/Haleakala-and-Hana-borings-.png

Tuesday, March 11:

Wednesday, March 12:

 Thursday, March 13:

Friday, March 14:

 

Please obey all signs and traffic controls and drive carefully around the workers.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.