There were 1,650 press releases posted in the last 24 hours and 401,746 in the last 365 days.

Ramp and Lane Closures for Spaghetti Bowl Construction Jan. 23-28

CARSON CITY, Nev. – The Nevada Department of Transportation is announcing street and ramp closures for Jan. 23-28 as part of continuing Reno Spaghetti Bowl improvements.

EAST FOURTH STREET CLOSURE 

  • East Fourth Street closed overnight between Galletti Way and Sixth Street 8 p.m.-6 a.m. Jan. 24-Feb. 1. Please use marked detours. Pedestrian and business access will be maintained.     

KIETZKE LANE CLOSURE Southbound I-580 bridges over Kietzke Lane are being renovated/widened. Detours posted. 

  • Kietzke Lane closed overnight between Kuenzli Street and Galletti Way from 8 p.m.-6 a.m. nightly Jan. 23-28. 

MILL/SECOND STREET RAMP CLOSURES

  • Access from southbound I-580 to Second Street and/or Mill Street intermittently closed from 8 p.m-6 a.m. nightly. Jan. 23 -28. 
  • Access to one route, either Second Street or Mill Street, will remain available.

SPAGHETTI BOWL RAMP CLOSURES 

  • These spaghetti bowl ramps will intermittently close from 8 p.m.-6 a.m. nightly Jan. 23-28. Additional periodic ramp closures to continue through 2022.       Eastbound I-80 to northbound U.S. 395       Eastbound I-80 to southbound I-580      Westbound I-80 to southbound I-580 (anticipated to take place evenings           of Jan. 26 and 27).

Schedule is subject to change.

The improvements are part of construction of the first phase of NDOT’s spaghetti bowl renovations, known as Spaghetti Bowl Xpress. Over the next two years, the eastbound I-80 to southbound I-580 Spaghetti Bowl ramp will be widened to two lanes and eastbound Interstate 80 lanes between Wells Avenue and the Spaghetti Bowl striped. On southbound I-580, auxiliary merge lanes and improved ramps will also be added between the Spaghetti Bowl and Plumb Lane, along with sound and aesthetic walls. The first phase of construction will not require relocation of any residences. 

For additional information, please visit NDOTSpaghettiBowl.com. You can also call the project hotline at (775) 636-4202, e-mail info@ndotspaghettibowl.com or text SBX to 797979 to sign up for text alerts. Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. Also follow @NevadaDOTReno on Twitter for traffic and project updates in northern Nevada, and @nevadadot on Twitter, Facebook, and Instagram for updates from across the state.