There were 207 press releases posted in the last 24 hours and 431,471 in the last 365 days.

Girard Avenue (U.S. 30) Lane Closures Scheduled for Bridge Construction in Philadelphia

King of Prussia, PA – Lane closures are scheduled on Girard Avenue (U.S. 30) in both directions between 34th Street and 38th Street for milling and paving under a project to replace the structure that carries four lanes of traffic and the SEPTA Route 15 trolley over CSX railroad tracks in the Parkside neighborhood of Philadelphia, the Pennsylvania Department of Transportation (PennDOT) announced today.

The work schedule is:

  • Monday, October 11, through Friday, October 15, from 7:00 PM to 6:00 AM the following morning; and
  • Monday, October 11, through Friday, October 29, from 9:00 AM to 3:00 PM.

Drivers are advised to allow extra time when traveling through the work areas because significant backups and delays will occur. All scheduled activities are weather dependent.

The scope of work on this project includes replacement of the bridge superstructure, rehabilitation of the stone support abutments and construction of a dedicated right turn lane on the eastbound Interstate 76 ramp to Girard Avenue (U.S. 30). The SEPTA trolley tracks will also be replaced across the bridge.

Neshaminy Constructors Inc. is the general contractor on the $4.2 million project, which is financed with 80 percent federal and 20 percent state funds.

Motorists can check conditions on more than 40,000 roadway miles by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.

For a complete list of construction projects impacting state-owned highways in Bucks, Chester, Delaware, Montgomery and Philadelphia counties, visit the District 6 Traffic Bulletin.

Information about infrastructure in District 6 including completed work and significant projects, is available at www.penndot.gov/D6Results. Find PennDOT's planned and active construction projects at www.projects.penndot.gov

Follow PennDOT on Twitter and like the department on Facebook and Instagram.

MEDIA CONTACT: Brad Rudolph, 610-205-6800

# # #

Girard Ave Lane Closures 34th to 38th.jpg

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.