There were 1,099 press releases posted in the last 24 hours and 400,905 in the last 365 days.

Interstate 80 Lane Reductions April 19-22 for Cleaning of Carlin Tunnels

Carson City, Nev. – Interstate 80 lanes in the Carlin area will be reduced Monday, April 19 through Thursday, April 22 for annual cleaning of the Carlin Tunnels, the Nevada Department of Transportation has announced.

One lane of traffic in each direction will be available for travel during the detours. Only one direction of interstate travel will be diverted at a time and traffic will be detoured through the Carlin Canyon or the opposing direction of tunnel during daylight hours Monday, April 19 through Thursday, April 22. 

The speed limit on I-80 will be reduced to 45 mph in the work zone in both the eastbound and westbound lanes. Additionally, the speed limit through the Carlin Canyon will be reduced to 35 mph in both directions.

For traveler safety, flaggers, signs and barrier rail will help detour traffic around the work zone. Motorists are asked to leave additional travel time, obey traffic controls and drive at posted speed limits, or slower as necessary for conditions. 

Nevada road construction information is available at dot.nv.gov or by dialing 511 or (775) 888-7000. 

SAFE WORK ZONE DRIVING TIPS

  • Always buckle up.
  • Watch for and follow all warning, closure and construction detour signs.
  • Pay attention and minimize distractions.
  • Always slow to posted work zone speed limits.
  • Keep consistent with traffic flow. 
  • Keep a safe distance from cars ahead, traffic barriers, construction equipment and workers.
  • Remain calm. Remember that work zones are not there to inconvenience you- they are necessary to improve the roadway.
  • Plan ahead and give yourself time to reach your destination. Simply dial ‘511’ or log onto www.nevadadot.com before driving for a listing of Nevada highway construction.