There were 1,815 press releases posted in the last 24 hours and 402,805 in the last 365 days.

Travel Advisory: Lane Split Coming to I-95 South at Eddy Street in Providence

The Rhode Island Department of Transportation (RIDOT) will put in place a lane split on I-95 southbound at the Eddy Street Exit (Exit 19) on Friday evening May 29. The split will be completely in place by 6:00 a.m. May 30 and will remain in place for two months.

This is part of the Bridge Group 1 project which includes routine bridge maintenance and rehabilitation of five bridges in the area two of which will have a full replacement. The total cost for this project is $19.5 million. It is scheduled for completion in May 2022.

The lane split will have two lanes to the left and one lane to the right which is a change from the current work zone configuration of three lanes to the left.

Travelers are advised to stay in their lane. All lanes go through.

All construction projects are subject to changes in schedule and scope depending on needs, circumstances, findings, and weather.

The Bridge Group 1 project is made possible by RhodeWorks, RIDOT's ongoing commitment to repair structurally deficient bridges and bring Rhode Island's transportation infrastructure into a state of good repair, promote economic development, and create jobs. Learn more at www.ridot.net/RhodeWorks.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.