There were 1,461 press releases posted in the last 24 hours and 398,763 in the last 365 days.

Alacer Gold Announces Release Date for Third Quarter 2017 Operational and Financial Results Conference Call

TORONTO, Oct. 17, 2017 (GLOBE NEWSWIRE) -- Alacer Gold Corp. (“Alacer” or the “Corporation”) (TSX:ASR) (ASX:AQG) plans to release its third quarter 2017 operating results, financial statements and the related management’s discussion and analysis before the Toronto Stock Exchange opens on Tuesday, October 31, 2017 (North America).

The Company will host a conference call and webcast to discuss the results at 5:00 p.m. on October 31, 2017 (North America Eastern Daylight Time) / 8:00 a.m. on November 1, 2017 (Australian Eastern Daylight Time).

You may listen to the call via webcast at http://services.choruscall.ca/links/alacer20171031.html. The conference call presentation will also be available at the link provided prior to the call commencing.

You may participate in the conference call by dialing:

     
1-800-319-4610    for U.S. and Canada
1-800-423-528   for Australia
800-930-470    for Hong Kong
800-101-2425   for Singapore
0808-101-2791    for United Kingdom
1-604-638-5340    for International
“Alacer Gold Call”   Conference ID
     

If you are unable to participate in the call, a webcast will be archived until February 1, 2018 and a recording of the call will be available on Alacer’s website at www.AlacerGold.com or through replay until Tuesday, December 12, 2017 by using passcode 1714# and calling:

     
1-855-669-9658    for U.S. and Canada
800-984-354    for Australia
     

The corresponding financial statements, management’s discussion and analysis, press release, and presentation will be posted on Alacer’s website and on www.SEDAR.com.

About Alacer

Alacer is a leading intermediate gold mining company, with an 80% interest in the world-class Çöpler Gold Mine in Turkey operated by Anagold Madencilik Sanayi ve Ticaret A.S. (“Anagold”), and the remaining 20% owned by Lidya Madencilik Sanayi ve Ticaret A.S. (“Lidya Mining”). The Corporation’s primary focus is to leverage its cornerstone Çöpler Mine and strong balance sheet to maximize portfolio value, maximize free cash flow, minimize project risk, and therefore, create maximum value for shareholders. The Çöpler Mine is located in east-central Turkey in the Erzincan Province, approximately 1,100 kilometers southeast from Istanbul and 550 kilometers east from Ankara, Turkey’s capital city.

Alacer is actively pursuing initiatives to enhance value beyond the current mine plan:

  • Çöpler Oxide Production Optimization – Expansion of the existing heap leach pad to 58 million tonnes continues to advance. The Corporation continues to evaluate opportunities to extend oxide production beyond the current reserves, including a new heap leach pad site to the west of the Çöpler Mine.

  • Çöpler Sulfide Expansion Project (the “Sulfide Project”) – The Sulfide Project is more than 60% complete, is under budget, and on schedule for first gold production in the third quarter 2018. The Sulfide Project is expected to deliver long-term growth with robust financial returns and adds 20 years of production at Çöpler. The Sulfide Project will bring Çöpler’s remaining life-of-mine (“LoM”) gold production to 4 million ounces at All-in Sustaining Costs averaging $645 per ounce1, [2].
     
  • The Corporation continues to pursue opportunities to further expand its current operating base and to become a sustainable multi-mine producer with a focus on Turkey. The systematic and focused exploration efforts in the Çöpler District, as well as in other regions of Turkey, are progressing. A maiden Mineral Resource estimate was released for Çakmaktepe and Bayramdere3, and the Çöpler District remains the focus with the potential to add oxide production in 2018 utilizing the existing Çöpler infrastructure. In the region, work has commenced on a Definitive Feasibility Study (“DFS”) for the Gediktepe Project 4 and is expected to be complete in June 2018.

Alacer is a Canadian corporation incorporated in the Yukon Territory with its primary listing on the Toronto Stock Exchange. The Corporation also has a secondary listing on the Australian Securities Exchange where CHESS Depository Interests trade.

For further information on Alacer Gold Corp., please contact:

Lisa Maestas – Director, Investor Relations at +1-303-292-1299

_________________

1 All-in Sustaining Costs per ounce is a non-IFRS performance measure with no standardized definition under IFRS. For further information and a detailed reconciliation to IFRS, please see the “Non-IFRS Measures” section of this MD&A.

2 Detailed information regarding the Sulfide Project, including the material assumptions on which the forward-looking financial information is based, can be found in the Technical Report dated June 9, 2016 entitled “Çöpler Mine Technical Report,” available on www.sedar.com and on www.asx.com.au

3 Detailed information regarding the Çöpler District Mineral Resource can be found in the press release entitled “Alacer Gold Announces Additional Exploration Results for Çakmaktepe and an Initial Mineral Resource in the Çöpler District,” dated December 19, 2016, available on www.sedar.com and on www.asx.com.au

4 Additional information on the Gediktepe Project can be found in the press release entitled “Alacer Gold Announces a New Reserve for its Gediktepe Project Providing Future Growth,” dated September 13, 2016, available on www.sedar.com and on www.asx.com.au

Primary Logo

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.