Global Data Center Construction Market 2016-2021: Finance, Internet, Telecommunications, Government and Others

Global Data Center Construction Market 2016-2021 Segment by Manufacturers AECOM, Arup Group, Corgan Associates, DPR Construction, HDR Architecture and more

PRINCETON, NEW JERSEY, UNITED STATES, August 17, 2016 /EINPresswire.com/ -- A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.

Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.

Download sample report at http://www.fiormarkets.com/report-detail/2819/request-sample

Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.

Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.

Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.

Scope of the Report:
This report focuses on the Data Center Construction in Global market, especially in North America, Europe and Asia-Pacific, Latin America, Middle and Africa. This report categorizes the market based on manufacturers, regions, type and application.

Access full report at http://www.fiormarkets.com/report/global-data-center-construction-market-by-manufacturers-regions-2819.html

Market Segment by Manufacturers, this report covers
AECOM
Arup Group
Corgan Associates
DPR Construction
Fluor
HDR Architecture
Holder Construction Group
ISG Construction
Jacobs Engineering Group
Jones Engineering
Nakano Corporation
Schneider Electric
SISK Group
Sweett Group
Turner Construction

Market Segment by Regions, regional analysis covers
North America (USA, Canada and Mexico)
Europe (Germany, France, UK, Russia and Italy)
Asia-Pacific (China, Japan, Korea, India and Southeast Asia)
Latin America, Middle and Africa

Market Segment by Type, covers
Electrical Construction
Mechanical Construction
General Construction

Market Segment by Applications, can be divided into
Finance
Internet
Telecommunications
Government
Others

There are 10 Chapters to deeply display the global Data Center Construction market.
Chanter 1, to analyze the top manufacturers of Data Center Construction, with sales, revenue, and price of Data Center Construction, in 2015 and 2016;

Chapter 2, to display the competitive situation among the top manufacturers, with sales, revenue and market share in 2015 and 2016;

"Chapter 3, to show the global market by regions, with sales, revenue and market share of Data Center Construction, for each region, from 2011 to 2016;
"

Chapter 4, 5, 6 and 7, to analyze the key regions, with sales, revenue and market share by key countries in these regions;

Chapter 8 and 9, to show the market by type and application, with sales market share and growth rate by type, application, from 2011 to 2016.

Chapter 10, Data Center Construction market forecast, by regions, type and application, with sales and revenue, from 2016 to 2021.

David Wayne
Fior Markets
2014654211
email us here

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.